IAC Assessment: NC0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product Commercial printer
NAICS n/a
SIC 2750 -
Sales $50,000,000-$100,000,000
# of Employees 134
Plant Area (Sq.Ft.) 102,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,372 5,050,410 kWh $0.03
Electricity Demand $118,871 14,163 kW-months/year $8.39
Electricity Fees $37,812 - $ -
Natural Gas $62,605 9,941 MMBtu $6.30
TOTAL ENERGY COSTS $374,381
RECOMMENDED SAVINGS* $187,696 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ $ $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,611
Cost:
$25,000
$6,853 244,725 $(-1,242) (-149) - - - - - - - - - - - - $6,853
244,725
kWh
$(-1,242)
(-149)
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$33,755
Cost:
$125,000
$8,324 297,479 $5,431 614 - - - - - - $20,000 - - - - - $8,324
297,479
kWh
$5,431
614
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$20,000
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$434
Cost:
$25
$249 8,792 $185 22 - - - - - - - - - - - - $249
8,792
kWh
$185
22
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$3,308
Cost:
$200
- - - - - - $3,308 220,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$3,308
220,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$22,875
Cost:
$100
- - - - - - - - - - $(-7,625) - $30,500 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$(-7,625)
-
$
$30,500
-
$
-
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$1,125
Cost:
$150
- - - - - - $1,125 75,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,125
75,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$9,088
Cost:
$1,200
- - - - $9,288 1,080,000 - - - - - - - - $(-200) - -
-
kWh
-
-
kW-months/year
$9,288
1,080,000
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
$(-200)
-
$
08: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$111,500
Cost:
$405,000
- - - - - - - - $84,000 - - - - - $27,500 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$84,000
-
$
-
-
$
-
-
$
$27,500
-
$
TOTAL RECOMMENDED Savings:
$187,696
Cost:
$556,675
$15,426 550,996 $4,374 487 $9,288 1,080,000 $4,433 295,000 $84,000 - $12,375 - $30,500 - $27,300 - $15,426
550,996
kWh
$4,374
487
kW-months/year
$9,288
1,080,000
Tgal
$4,433
295,000
lb
$84,000
-
$
$12,375
-
$
$30,500
-
$
$27,300
-
$
TOTAL IMPLEMENTED Savings:
$24,000
Cost:
$250
- - - - - - $1,125 75,000 - - $(-7,625) - $30,500 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,125
75,000
lb
-
-
$
$(-7,625)
-
$
$30,500
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost