IAC Assessment: NC0161
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product Ready to assemble bookcases
NAICS n/a
SIC 2511 - Wood Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 150,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,260 1,342,907 kWh $0.05
Electricity Demand $34,034 6,960 kW-months/year $4.89
Electricity Fees $3,272 - $ -
Natural Gas $14,152 2,274 MMBtu $6.22
TOTAL ENERGY COSTS $144,707
RECOMMENDED SAVINGS* $169,442 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,140
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,160
Cost:
$500
- - - - $1,160 187 - - - - - - -
-
kWh
-
-
kW-months/year
$1,160
187
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,328
Cost:
$20
$1,328 28,136 - - - - - - - - - - $1,328
28,136
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,140
Cost:
$1,650
- - $8,015 1,639 - - - - $(-1,875) - - - -
-
kWh
$8,015
1,639
kW-months/year
-
-
MMBtu
-
-
lb
$(-1,875)
-
$
-
-
$
04: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$160,533
Cost:
$279,000
$38,957 1,598,476 - - $18,859 3,032 $82,717 2,398 - - $20,000 - $38,957
1,598,476
kWh
-
-
kW-months/year
$18,859
3,032
MMBtu
$82,717
2,398
lb
-
-
$
$20,000
-
$
05: 3.6121 BURN WASTE PAPER FOR HEAT Savings:
$281
Cost:
-
- - - - - - $281 18,750 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$281
18,750
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$169,442
Cost:
$281,170
$40,285 1,626,612 $8,015 1,639 $20,019 3,219 $82,998 21,148 $(-1,875) - $20,000 - $40,285
1,626,612
kWh
$8,015
1,639
kW-months/year
$20,019
3,219
MMBtu
$82,998
21,148
lb
$(-1,875)
-
$
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$6,140
Cost:
$1,650
- - $8,015 1,639 - - - - $(-1,875) - - - -
-
kWh
$8,015
1,639
kW-months/year
-
-
MMBtu
-
-
lb
$(-1,875)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes