Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1999 |
Principal Product | Ready to assemble bookcases |
NAICS | n/a |
SIC | 2511 - Wood Household Furniture |
Sales | $10,000,000-$50,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $63,260 | 1,342,907 | kWh | $0.05 |
Electricity Demand | $34,034 | 6,960 | kW-months/year | $4.89 |
Electricity Fees | $3,272 | - | $ | - |
Natural Gas | $14,152 | 2,274 | MMBtu | $6.22 |
TOTAL ENERGY COSTS | $144,707 | |||
RECOMMENDED SAVINGS* | $169,442 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,140 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,160 Cost: $500 |
- | - | - | - | $1,160 | 187 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,160 187 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,328 Cost: $20 |
$1,328 | 28,136 | - | - | - | - | - | - | - | - | - | - |
$1,328 28,136 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $6,140 Cost: $1,650 |
- | - | $8,015 | 1,639 | - | - | - | - | $(-1,875) | - | - | - |
- - kWh |
$8,015 1,639 kW-months/year |
- - MMBtu |
- - lb |
$(-1,875) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
Savings: $160,533 Cost: $279,000 |
$38,957 | 1,598,476 | - | - | $18,859 | 3,032 | $82,717 | 2,398 | - | - | $20,000 | - |
$38,957 1,598,476 kWh |
- - kW-months/year |
$18,859 3,032 MMBtu |
$82,717 2,398 lb |
- - $ |
$20,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6121 BURN WASTE PAPER FOR HEAT |
Savings: $281 Cost: - |
- | - | - | - | - | - | $281 | 18,750 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$281 18,750 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $169,442 Cost: $281,170 |
$40,285 | 1,626,612 | $8,015 | 1,639 | $20,019 | 3,219 | $82,998 | 21,148 | $(-1,875) | - | $20,000 | - | $40,285 1,626,612 kWh |
$8,015 1,639 kW-months/year |
$20,019 3,219 MMBtu |
$82,998 21,148 lb |
$(-1,875) - $ |
$20,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,140 Cost: $1,650 |
- | - | $8,015 | 1,639 | - | - | - | - | $(-1,875) | - | - | - | - - kWh |
$8,015 1,639 kW-months/year |
- - MMBtu |
- - lb |
$(-1,875) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |