IAC logo
IAC Assessment: NC0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product Filters for molten metal
NAICS n/a
SIC 3290 -
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 175,000
Annual Production 396,000 Pieces
Production Hrs. Annual 5,800
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,865 7,260,551 kWh $0.03
Electricity Demand $179,597 18,972 kW-months/year $9.47
Electricity Fees $24,577 - $ -
Natural Gas $489,781 121,096 MMBtu $4.04
TOTAL ENERGY COSTS $895,820
RECOMMENDED SAVINGS* $70,804 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$9,405
Cost:
$15,000
- - - - $9,405 2,328 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$9,405
2,328
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,501
Cost:
$20,000
$(-1,092) (-41,325) $(-433) (-57) $7,026 1,739 - - - - - - - - - - $(-1,092)
(-41,325)
kWh
$(-433)
(-57)
kW-months/year
$7,026
1,739
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,911
Cost:
$10,500
- - - - $41,911 10,374 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$41,911
10,374
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$7,571
Cost:
$9,450
$(-1,150) (-43,669) $(-561) (-60) - - - - - - - - - - $9,282 - $(-1,150)
(-43,669)
kWh
$(-561)
(-60)
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
$9,282
-
Tgal
05: 3.4155 METER WASTE WATER Savings:
$2,279
Cost:
$1,500
- - - - - - $2,279 930,719 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,279
930,719
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,019
Cost:
$1,050
- - - - - - - - $5,019 323,790 $(-4,000) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,019
323,790
lb
$(-4,000)
-
$
-
-
$
-
-
Tgal
07: 3.7121 IMPROVE HANDLING PRACTICES Savings:
$1,609
Cost:
$1,500
- - - - - - $1,609 112,500 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,609
112,500
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
08: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$1,509
Cost:
$5,200
$(-142) (-5,275) $(-99) (-11) - - - - - - $2,000 - $(-250) - - - $(-142)
(-5,275)
kWh
$(-99)
(-11)
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$2,000
-
$
$(-250)
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$70,804
Cost:
$64,200
$(-2,384) (-90,269) $(-1,093) (-128) $58,342 14,441 $3,888 1,043,219 $5,019 323,790 $(-2,000) - $(-250) - $9,282 - $(-2,384)
(-90,269)
kWh
$(-1,093)
(-128)
kW-months/year
$58,342
14,441
MMBtu
$3,888
1,043,219
Tgal
$5,019
323,790
lb
$(-2,000)
-
$
$(-250)
-
$
$9,282
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Water Consumption