IAC logo
IAC Assessment: NC0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product car and forklift batteries
NAICS n/a
SIC 3692 - Primary Batteries, Dry And Wet
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 225,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,064,021 40,935,815 kWh $0.03
Electricity Demand $709,380 75,962 kW-months/year $9.34
Electricity Fees $17,911 - $ -
Natural Gas $306,160 71,041 MMBtu $4.31
TOTAL ENERGY COSTS $2,188,762
RECOMMENDED SAVINGS* $1,240,589 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,009,289
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ %
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$28,720
Cost:
$10,000
$22,343 859,613 $22,178 2,354 $(-15,801) (-3,666) - - - - - - - - $22,343
859,613
kWh
$22,178
2,354
kW-months/year
$(-15,801)
(-3,666)
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
%
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,539
Cost:
$1,500
- - - - $4,539 1,053 - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,539
1,053
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
%
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$151,290
Cost:
$29,000
- - - - - - $91,290 8,200 $60,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$91,290
8,200
gal
$60,000
-
$
-
-
$
-
-
%
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$231,300
Cost:
$1,600,000
- - - - - - - - - - - - $231,300 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$231,300
-
%
05: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT Savings:
$824,740
Cost:
$836,000
- - - - - - - - - - $(-20,000) - $844,740 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$(-20,000)
-
$
$844,740
-
%
TOTAL RECOMMENDED Savings:
$1,240,589
Cost:
$2,476,500
$22,343 859,613 $22,178 2,354 $(-11,262) (-2,613) $91,290 8,200 $60,000 - $(-20,000) - $1,076,040 - $22,343
859,613
kWh
$22,178
2,354
kW-months/year
$(-11,262)
(-2,613)
MMBtu
$91,290
8,200
gal
$60,000
-
$
$(-20,000)
-
$
$1,076,040
-
%
TOTAL IMPLEMENTED Savings:
$1,009,289
Cost:
$876,500
$22,343 859,613 $22,178 2,354 $(-11,262) (-2,613) $91,290 8,200 $60,000 - $(-20,000) - $844,740 - $22,343
859,613
kWh
$22,178
2,354
kW-months/year
$(-11,262)
(-2,613)
MMBtu
$91,290
8,200
gal
$60,000
-
$
$(-20,000)
-
$
$844,740
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Increase in Production