IAC logo
IAC Assessment: NC0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product Barbecue
NAICS n/a
SIC 2010 -
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 50,000
Annual Production 3,750,000 Pounds
Production Hrs. Annual 3,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,149 1,682,298 kWh $0.03
Electricity Demand $29,056 3,414 kW-months/year $8.51
Electricity Fees $3,048 - $ -
Natural Gas $35,149 5,931 MMBtu $5.93
TOTAL ENERGY COSTS $117,590
RECOMMENDED SAVINGS* $63,864 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,509
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,315
Cost:
$9,860
$1,109 37,222 $1,242 149 - - - - $964 - - - $1,109
37,222
kWh
$1,242
149
kW-months/year
-
-
MMBtu
-
-
lb
$964
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,700
Cost:
$9,240
$295 9,965 $497 59 - - - - $908 - - - $295
9,965
kWh
$497
59
kW-months/year
-
-
MMBtu
-
-
lb
$908
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$167
Cost:
$20
$78 2,638 $89 11 - - - - - - - - $78
2,638
kWh
$89
11
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$2,154
Cost:
$800
- - - - $2,154 363 - - - - - - -
-
kWh
-
-
kW-months/year
$2,154
363
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$90
Cost:
$90
$51 1,758 $39 5 - - - - - - - - $51
1,758
kWh
$39
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$188
Cost:
$300
- - - - - - $188 12,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$188
12,500
lb
-
-
$
-
-
$
07: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$56,250
Cost:
$10,000
- - - - - - - - - - $56,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$56,250
-
$
TOTAL RECOMMENDED Savings:
$63,864
Cost:
$30,310
$1,533 51,583 $1,867 224 $2,154 363 $188 12,500 $1,872 - $56,250 - $1,533
51,583
kWh
$1,867
224
kW-months/year
$2,154
363
MMBtu
$188
12,500
lb
$1,872
-
$
$56,250
-
$
TOTAL IMPLEMENTED Savings:
$63,509
Cost:
$29,990
$1,455 48,945 $1,778 213 $2,154 363 - - $1,872 - $56,250 - $1,455
48,945
kWh
$1,778
213
kW-months/year
$2,154
363
MMBtu
-
-
lb
$1,872
-
$
$56,250
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Product