IAC logo
IAC Assessment: NC0181
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0181
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Capacitors
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 173,800
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $503,156 21,508,793 kWh $0.02
Electricity Demand $557,245 34,428 kW-months/year $16.19
Electricity Fees $8,064 - $ -
Natural Gas $25,000 4,000 MMBtu $6.25
TOTAL ENERGY COSTS $1,093,465
RECOMMENDED SAVINGS* $57,151 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,376
Cost:
$5,400
$2,511 107,268 $2,865 179 - - $2,511
107,268
kWh
$2,865
179
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$12,754
Cost:
$65,000
$9,755 417,057 $11,131 69 $(-8,132) (-2,033) $9,755
417,057
kWh
$11,131
69
kW-months/year
$(-8,132)
(-2,033)
MMBtu
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$18,564
Cost:
$37,378
$8,189 349,941 $10,375 583 - - $8,189
349,941
kWh
$10,375
583
kW-months/year
-
-
MMBtu
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$5,692
Cost:
$18,000
$5,692 243,259 - - - - $5,692
243,259
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$14,765
Cost:
$42,000
$6,157 263,189 $8,608 533 - - $6,157
263,189
kWh
$8,608
533
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$57,151
Cost:
$167,778
$32,304 1,380,714 $32,979 1,364 $(-8,132) (-2,033) $32,304
1,380,714
kWh
$32,979
1,364
kW-months/year
$(-8,132)
(-2,033)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas