IAC logo
IAC Assessment: NC0182
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0182
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Semiconductor chips
NAICS n/a
SIC 3647 - Vehicular Lighting Equipment
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 40,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,277 899,766 kWh $0.05
Electricity Demand $9,316 2,700 kW-months/year $3.45
Electricity Fees $1,841 - $ -
TOTAL ENERGY COSTS $53,834
RECOMMENDED SAVINGS* $9,977 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,368
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,121
Cost:
$3,086
$778 16,413 $343 99 - - $778
16,413
kWh
$343
99
kW-months/year
-
-
lb
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$357
Cost:
$375
$357 7,620 - - - - $357
7,620
kWh
-
-
kW-months/year
-
-
lb
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$632
Cost:
$167
$632 13,482 - - - - $632
13,482
kWh
-
-
kW-months/year
-
-
lb
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$579
Cost:
$420
$579 12,309 - - - - $579
12,309
kWh
-
-
kW-months/year
-
-
lb
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,099
Cost:
$3,000
$1,322 28,136 $777 225 - - $1,322
28,136
kWh
$777
225
kW-months/year
-
-
lb
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,789
Cost:
$2,100
$4,789 101,993 - - - - $4,789
101,993
kWh
-
-
kW-months/year
-
-
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$400
Cost:
$300
- - - - $400 2,000 -
-
kWh
-
-
kW-months/year
$400
2,000
lb
TOTAL RECOMMENDED Savings:
$9,977
Cost:
$9,448
$8,457 179,953 $1,120 324 $400 2,000 $8,457
179,953
kWh
$1,120
324
kW-months/year
$400
2,000
lb
TOTAL IMPLEMENTED Savings:
$5,368
Cost:
$2,520
$5,368 114,302 - - - - $5,368
114,302
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)