Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2000 |
Principal Product | Frame parts for furniture |
NAICS | n/a |
SIC | 2512 - Upholstered Household Furniture |
Sales | $1,000,000-$5,000,000 |
# of Employees | 54 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 3,000 Thousand Feet |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $158,675 | 3,355,510 | kWh | $0.05 |
Electricity Demand | $26,990 | 8,937 | kW-months/year | $3.02 |
Electricity Fees | $5,224 | - | $ | - |
Natural Gas | $11,781 | 1,758 | MMBtu | $6.70 |
TOTAL ENERGY COSTS | $202,670 | |||
RECOMMENDED SAVINGS* | $51,824 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,826 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $600 Cost: $440 |
$503 | 10,551 | $97 | 32 | - | - | - | - | - | - |
$503 10,551 kWh |
$97 32 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $526 Cost: $1,623 |
$422 | 8,972 | $104 | 34 | - | - | - | - | - | - |
$422 8,972 kWh |
$104 34 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,067 Cost: $6,800 |
$1,495 | 31,653 | $572 | 190 | - | - | - | - | - | - |
$1,495 31,653 kWh |
$572 190 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING |
Savings: $2,795 Cost: $1,500 |
- | - | - | - | $2,795 | 417 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,795 417 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,106 Cost: $500 |
$953 | 20,223 | $153 | 50 | - | - | - | - | - | - |
$953 20,223 kWh |
$153 50 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS |
Savings: $15,323 Cost: $2,200 |
$13,214 | 279,308 | $2,109 | 698 | - | - | - | - | - | - |
$13,214 279,308 kWh |
$2,109 698 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT |
Savings: $3,120 Cost: - |
$(-73) | (-1,465) | - | - | $2,117 | 316 | $1,276 | 72,900 | $(-200) | - |
$(-73) (-1,465) kWh |
- - kW-months/year |
$2,117 316 MMBtu |
$1,276 72,900 lb |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $26,287 Cost: $960 |
$16,687 | 352,872 | - | - | - | - | - | - | $9,600 | - |
$16,687 352,872 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$9,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $51,824 Cost: $14,023 |
$33,201 | 702,114 | $3,035 | 1,004 | $4,912 | 733 | $1,276 | 72,900 | $9,400 | - | $33,201 702,114 kWh |
$3,035 1,004 kW-months/year |
$4,912 733 MMBtu |
$1,276 72,900 lb |
$9,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,826 Cost: $940 |
$1,383 | 29,309 | $250 | 82 | $2,117 | 316 | $1,276 | 72,900 | $(-200) | - | $1,383 29,309 kWh |
$250 82 kW-months/year |
$2,117 316 MMBtu |
$1,276 72,900 lb |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |