IAC Assessment: NC0191
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0191
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Door sills
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 350,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,110 4,346,424 kWh $0.03
Electricity Demand $64,675 11,378 kW-months/year $5.68
Electricity Fees $8,168 - $ -
Natural Gas $33,555 4,859 MMBtu $6.91
TOTAL ENERGY COSTS $247,508
RECOMMENDED SAVINGS* $42,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,848
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,005
Cost:
$1,000
- - - - $1,005 145 - - - - - - -
-
kWh
-
-
kW-months/year
$1,005
145
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,096
Cost:
$1,753
$395 12,309 $701 74 - - - - - - - - $395
12,309
kWh
$701
74
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$545
Cost:
$1,050
- - - - $545 83 - - - - - - -
-
kWh
-
-
kW-months/year
$545
83
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$593
Cost:
-
$236 5,275 $357 94 - - - - - - - - $236
5,275
kWh
$357
94
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$701
Cost:
-
$441 13,775 $260 28 - - - - - - - - $441
13,775
kWh
$260
28
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$29,945
Cost:
$40,000
$6,170 192,849 $10,966 1,157 $12,809 1,843 - - - - - - $6,170
192,849
kWh
$10,966
1,157
kW-months/year
$12,809
1,843
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,556
Cost:
$1,000
$1,040 22,567 $516 136 - - - - - - - - $1,040
22,567
kWh
$516
136
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 4.453 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION Savings:
$6,729
Cost:
$288
- - - - - - $(-3,167) - $6,563 - $3,333 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-3,167)
-
$
$6,563
-
$
$3,333
-
$
TOTAL RECOMMENDED Savings:
$42,170
Cost:
$45,091
$8,282 246,775 $12,800 1,489 $14,359 2,071 $(-3,167) - $6,563 - $3,333 - $8,282
246,775
kWh
$12,800
1,489
kW-months/year
$14,359
2,071
MMBtu
$(-3,167)
-
$
$6,563
-
$
$3,333
-
$
TOTAL IMPLEMENTED Savings:
$34,848
Cost:
$44,803
$8,046 241,500 $12,443 1,395 $14,359 2,071 - - - - - - $8,046
241,500
kWh
$12,443
1,395
kW-months/year
$14,359
2,071
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product