Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2000 |
Principal Product | Paperboard cartons |
NAICS | n/a |
SIC | 2671 - Paper Coated & Laminated, Packaging |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 223,500,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $211,407 | 8,149,473 | kWh | $0.03 |
Electricity Demand | $153,302 | 16,227 | kW-months/year | $9.45 |
Electricity Fees | $13,789 | - | $ | - |
Natural Gas | $33,497 | 5,131 | MMBtu | $6.53 |
TOTAL ENERGY COSTS | $411,995 | |||
RECOMMENDED SAVINGS* | $127,259 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,432 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,843 Cost: $10,160 |
$1,004 | 39,859 | $839 | 89 | - | - | - | - |
$1,004 39,859 kWh |
$839 89 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,718 Cost: $50,100 |
$3,961 | 157,386 | $2,962 | 314 | - | - | $5,795 | - |
$3,961 157,386 kWh |
$2,962 314 kW-months/year |
- - MMBtu |
$5,795 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,432 Cost: $3,250 |
$2,374 | 94,373 | $2,058 | 218 | - | - | - | - |
$2,374 94,373 kWh |
$2,058 218 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $87,421 Cost: $288,000 |
$78,003 | 3,096,424 | $50,560 | 5,730 | $(-43,142) | (-11,902) | $2,000 | - |
$78,003 3,096,424 kWh |
$50,560 5,730 kW-months/year |
$(-43,142) (-11,902) MMBtu |
$2,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING |
Savings: $20,845 Cost: $10,000 |
$13,645 | 541,618 | $7,200 | 764 | - | - | - | - |
$13,645 541,618 kWh |
$7,200 764 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $127,259 Cost: $361,510 |
$98,987 | 3,929,660 | $63,619 | 7,115 | $(-43,142) | (-11,902) | $7,795 | - | $98,987 3,929,660 kWh |
$63,619 7,115 kW-months/year |
$(-43,142) (-11,902) MMBtu |
$7,795 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,432 Cost: $3,250 |
$2,374 | 94,373 | $2,058 | 218 | - | - | - | - | $2,374 94,373 kWh |
$2,058 218 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |