IAC logo
IAC Assessment: NC0192
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0192
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Paperboard cartons
NAICS n/a
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 180,000
Annual Production 223,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,407 8,149,473 kWh $0.03
Electricity Demand $153,302 16,227 kW-months/year $9.45
Electricity Fees $13,789 - $ -
Natural Gas $33,497 5,131 MMBtu $6.53
TOTAL ENERGY COSTS $411,995
RECOMMENDED SAVINGS* $127,259 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,432
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,843
Cost:
$10,160
$1,004 39,859 $839 89 - - - - $1,004
39,859
kWh
$839
89
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,718
Cost:
$50,100
$3,961 157,386 $2,962 314 - - $5,795 - $3,961
157,386
kWh
$2,962
314
kW-months/year
-
-
MMBtu
$5,795
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,432
Cost:
$3,250
$2,374 94,373 $2,058 218 - - - - $2,374
94,373
kWh
$2,058
218
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$87,421
Cost:
$288,000
$78,003 3,096,424 $50,560 5,730 $(-43,142) (-11,902) $2,000 - $78,003
3,096,424
kWh
$50,560
5,730
kW-months/year
$(-43,142)
(-11,902)
MMBtu
$2,000
-
$
05: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING Savings:
$20,845
Cost:
$10,000
$13,645 541,618 $7,200 764 - - - - $13,645
541,618
kWh
$7,200
764
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$127,259
Cost:
$361,510
$98,987 3,929,660 $63,619 7,115 $(-43,142) (-11,902) $7,795 - $98,987
3,929,660
kWh
$63,619
7,115
kW-months/year
$(-43,142)
(-11,902)
MMBtu
$7,795
-
$
TOTAL IMPLEMENTED Savings:
$4,432
Cost:
$3,250
$2,374 94,373 $2,058 218 - - - - $2,374
94,373
kWh
$2,058
218
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes