Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2000 |
Principal Product | Strain gages |
NAICS | n/a |
SIC | 3829 - Measuring & Controlling Devices, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 396 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 50,000,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $157,304 | 5,037,808 | kWh | $0.03 |
Electricity Demand | $132,084 | 16,074 | kW-months/year | $8.22 |
Electricity Fees | $9,385 | - | $ | - |
TOTAL ENERGY COSTS | $356,954 | |||
RECOMMENDED SAVINGS* | $47,762 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,279 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING |
Savings: $429 Cost: $835 |
$429 | 13,775 | - | - | - | - | - | - | - | - |
$429 13,775 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7145 INSTALL SKYLIGHTS |
Savings: $3,443 Cost: $7,000 |
$1,335 | 42,790 | $2,108 | 257 | - | - | - | - | - | - |
$1,335 42,790 kWh |
$2,108 257 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM |
Savings: $13,561 Cost: $29,000 |
$3,486 | 111,665 | $14,922 | 1,787 | $(-4,847) | (-440,640) | - | - | - | - |
$3,486 111,665 kWh |
$14,922 1,787 kW-months/year |
$(-4,847) (-440,640) Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $483 Cost: $400 |
- | - | - | - | - | - | $483 | 27,576 | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$483 27,576 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER |
Savings: $29,846 Cost: $20,200 |
$(-824) | (-26,377) | $(-867) | 106 | $24,204 | 154,000 | - | - | $7,333 | - |
$(-824) (-26,377) kWh |
$(-867) 106 kW-months/year |
$24,204 154,000 Tgal |
- - lb |
$7,333 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,762 Cost: $57,435 |
$4,426 | 141,853 | $16,163 | 2,150 | $19,357 | (-286,640) | $483 | 27,576 | $7,333 | - | $4,426 141,853 kWh |
$16,163 2,150 kW-months/year |
$19,357 (-286,640) Tgal |
$483 27,576 lb |
$7,333 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,279 Cost: $57,035 |
$4,426 | 141,853 | $16,163 | 2,150 | $19,357 | (-286,640) | - | - | $7,333 | - | $4,426 141,853 kWh |
$16,163 2,150 kW-months/year |
$19,357 (-286,640) Tgal |
- - lb |
$7,333 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Ancillary Material Cost |