IAC Assessment: NC0194
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0194
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Strain gages
NAICS n/a
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $10,000,000-$50,000,000
# of Employees 396
Plant Area (Sq.Ft.) 200,000
Annual Production 50,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,304 5,037,808 kWh $0.03
Electricity Demand $132,084 16,074 kW-months/year $8.22
Electricity Fees $9,385 - $ -
TOTAL ENERGY COSTS $356,954
RECOMMENDED SAVINGS* $47,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,279
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING Savings:
$429
Cost:
$835
$429 13,775 - - - - - - - - $429
13,775
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$3,443
Cost:
$7,000
$1,335 42,790 $2,108 257 - - - - - - $1,335
42,790
kWh
$2,108
257
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$13,561
Cost:
$29,000
$3,486 111,665 $14,922 1,787 $(-4,847) (-440,640) - - - - $3,486
111,665
kWh
$14,922
1,787
kW-months/year
$(-4,847)
(-440,640)
Tgal
-
-
lb
-
-
$
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$483
Cost:
$400
- - - - - - $483 27,576 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$483
27,576
lb
-
-
$
05: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$29,846
Cost:
$20,200
$(-824) (-26,377) $(-867) 106 $24,204 154,000 - - $7,333 - $(-824)
(-26,377)
kWh
$(-867)
106
kW-months/year
$24,204
154,000
Tgal
-
-
lb
$7,333
-
$
TOTAL RECOMMENDED Savings:
$47,762
Cost:
$57,435
$4,426 141,853 $16,163 2,150 $19,357 (-286,640) $483 27,576 $7,333 - $4,426
141,853
kWh
$16,163
2,150
kW-months/year
$19,357
(-286,640)
Tgal
$483
27,576
lb
$7,333
-
$
TOTAL IMPLEMENTED Savings:
$47,279
Cost:
$57,035
$4,426 141,853 $16,163 2,150 $19,357 (-286,640) - - $7,333 - $4,426
141,853
kWh
$16,163
2,150
kW-months/year
$19,357
(-286,640)
Tgal
-
-
lb
$7,333
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Ancillary Material Cost