IAC Assessment: NC0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Denim fabric
NAICS n/a
SIC 2321 - Men's and Boys' Shirts, Except Work Shirts
Sales $50,000,000-$100,000,000
# of Employees 220
Plant Area (Sq.Ft.) 300,000
Annual Production 45,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $529,790 22,447,832 kWh $0.02
Electricity Demand $650,320 40,306 kW-months/year $16.13
Electricity Fees $62,145 - $ -
Natural Gas $607,782 128,616 MMBtu $4.73
TOTAL ENERGY COSTS $1,850,037
RECOMMENDED SAVINGS* $183,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $172,702
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$150,957
Cost:
$214,000
$(-1,147) (-48,652) $(-1,119) (-72) $158,516 35,226 $(-5,293) (-998,640) $(-1,147)
(-48,652)
kWh
$(-1,119)
(-72)
kW-months/year
$158,516
35,226
MMBtu
$(-5,293)
(-998,640)
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,306
Cost:
$300
$3,785 160,317 $3,521 220 - - - - $3,785
160,317
kWh
$3,521
220
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7122 DISCONNECT BALLASTS Savings:
$7,600
Cost:
$6,350
$3,938 167,057 $3,662 229 - - - - $3,938
167,057
kWh
$3,662
229
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,637
Cost:
$7,260
$734 31,067 $1,903 119 - - - - $734
31,067
kWh
$1,903
119
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$6,839
Cost:
$3,180
$3,648 154,748 $3,191 199 - - - - $3,648
154,748
kWh
$3,191
199
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,675
Cost:
$50
$1,904 80,598 $1,771 111 - - - - $1,904
80,598
kWh
$1,771
111
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$4,632
Cost:
$7,499
$(-59) (-2,345) - - $4,691 992 - - $(-59)
(-2,345)
kWh
-
-
kW-months/year
$4,691
992
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$183,646
Cost:
$238,639
$12,803 542,790 $12,929 806 $163,207 36,218 $(-5,293) (-998,640) $12,803
542,790
kWh
$12,929
806
kW-months/year
$163,207
36,218
MMBtu
$(-5,293)
(-998,640)
Tgal
TOTAL IMPLEMENTED Savings:
$172,702
Cost:
$223,830
$10,224 433,470 $9,255 576 $158,516 35,226 $(-5,293) (-998,640) $10,224
433,470
kWh
$9,255
576
kW-months/year
$158,516
35,226
MMBtu
$(-5,293)
(-998,640)
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal