IAC logo
IAC Assessment: NC0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Cotton/polyester yarn
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 200,000
Annual Production 28,600,000 Pounds
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,142,058 32,594,373 kWh $0.04
Electricity Demand $469,944 52,913 kW-months/year $8.88
Electricity Fees $(-68,603) - $ -
TOTAL ENERGY COSTS $1,543,399
RECOMMENDED SAVINGS* $76,462 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$20,439
Cost:
$27,000
$17,739 657,093 $2,700 375 - - - - $17,739
657,093
kWh
$2,700
375
kW-months/year
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,705
Cost:
$51,300
$6,372 236,225 $2,333 324 - - - - $6,372
236,225
kWh
$2,333
324
kW-months/year
-
-
Tgal
-
-
$
03: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$921
Cost:
$1,000
$508 18,757 $813 120 - - $(-400) - $508
18,757
kWh
$813
120
kW-months/year
-
-
Tgal
$(-400)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$30,871
Cost:
$10,600
$22,611 837,632 $8,260 1,147 - - - - $22,611
837,632
kWh
$8,260
1,147
kW-months/year
-
-
Tgal
-
-
$
05: 3.4155 METER WASTE WATER Savings:
$15,526
Cost:
$7,025
- - - - $15,526 - - - -
-
kWh
-
-
kW-months/year
$15,526
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$76,462
Cost:
$96,925
$47,230 1,749,707 $14,106 1,966 $15,526 - $(-400) - $47,230
1,749,707
kWh
$14,106
1,966
kW-months/year
$15,526
-
Tgal
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes