Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2001 |
Principal Product | Ground silica |
NAICS | n/a |
SIC | 3295 - Minerals, Ground Or Treated |
Sales | $10,000,000-$50,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 780,000,000 Pounds |
Production Hrs. Annual | 8,320 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $399,744 | 20,267,647 | kWh | $0.02 |
Electricity Demand | $454,768 | 40,733 | kW-months/year | $11.16 |
Electricity Fees | $(-83,782) | - | $ | - |
Natural Gas | $378,217 | 78,073 | MMBtu | $4.84 |
TOTAL ENERGY COSTS | $1,148,947 | |||
RECOMMENDED SAVINGS* | $71,987 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,892 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $2,937 Cost: $4,950 |
- | - | - | - | $2,937 | 607 | - | - |
- - kWh |
- - kW-months/year |
$2,937 607 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $45,000 Cost: $21,500 |
- | - | - | - | $46,000 | 9,504 | $(-1,000) | - |
- - kWh |
- - kW-months/year |
$46,000 9,504 MMBtu |
$(-1,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $151 Cost: $2,700 |
$35 | 1,800 | $116 | 11 | - | - | - | - |
$35 1,800 kWh |
$116 11 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $113 Cost: $200 |
$45 | 2,300 | $68 | 6 | - | - | - | - |
$45 2,300 kWh |
$68 6 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $792 Cost: $100 |
$443 | 22,464 | $349 | 32 | - | - | - | - |
$443 22,464 kWh |
$349 32 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $158 Cost: $200 |
$88 | 4,484 | $70 | 6 | - | - | - | - |
$88 4,484 kWh |
$70 6 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $22,836 Cost: $6,500 |
- | - | - | - | $11,336 | 2,342 | $11,500 | - |
- - kWh |
- - kW-months/year |
$11,336 2,342 MMBtu |
$11,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $71,987 Cost: $36,150 |
$611 | 31,048 | $603 | 55 | $60,273 | 12,453 | $10,500 | - | $611 31,048 kWh |
$603 55 kW-months/year |
$60,273 12,453 MMBtu |
$10,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,892 Cost: $9,500 |
$523 | 26,564 | $533 | 49 | $11,336 | 2,342 | $11,500 | - | $523 26,564 kWh |
$533 49 kW-months/year |
$11,336 2,342 MMBtu |
$11,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |