IAC Assessment: NC0209
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2001
Principal Product Knitted fabric
NAICS n/a
SIC 2253 - Knit Outerwear Mills
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 125,804
Annual Production 13,500,000 Pounds
Production Hrs. Annual 8,488
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,499 3,628,440 kWh $0.03
Electricity Demand $79,397 9,284 kW-months/year $8.55
LPG $7,772 914 MMBtu $8.50
TOTAL ENERGY COSTS $193,243
RECOMMENDED SAVINGS* $11,249 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,568
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,845
Cost:
$5,600
$1,282 44,525 $(-137) (-17) $1,700 200 - - - - $1,282
44,525
kWh
$(-137)
(-17)
kW-months/year
$1,700
200
MMBtu
-
-
lb
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,519
Cost:
$5,600
$2,519 87,480 - - - - - - - - $2,519
87,480
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,161
Cost:
$5,700
$2,131 74,003 $1,030 124 - - - - - - $2,131
74,003
kWh
$1,030
124
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$163
Cost:
$200
$111 3,851 $52 6 - - - - - - $111
3,851
kWh
$52
6
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,886
Cost:
$2,360
$335 11,644 $163 19 - - - - $1,388 - $335
11,644
kWh
$163
19
kW-months/year
-
-
MMBtu
-
-
lb
$1,388
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$675
Cost:
$200
- - - - - - $675 90,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$675
90,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$11,249
Cost:
$19,660
$6,378 221,503 $1,108 132 $1,700 200 $675 90,000 $1,388 - $6,378
221,503
kWh
$1,108
132
kW-months/year
$1,700
200
MMBtu
$675
90,000
lb
$1,388
-
$
TOTAL IMPLEMENTED Savings:
$4,568
Cost:
$8,160
$2,965 102,975 $215 25 - - - - $1,388 - $2,965
102,975
kWh
$215
25
kW-months/year
-
-
MMBtu
-
-
lb
$1,388
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes