IAC Assessment: NC0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2001
Principal Product Feldspar
NAICS n/a
SIC 3299 - Nonmetallic Mineral Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 31
Plant Area (Sq.Ft.) 50,000
Annual Production 440,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $387,604 9,590,208 kWh $0.04
Electricity Demand $139,948 17,773 kW-months/year $7.87
Fuel Oil #4 $301,000 95,200 MMBtu $3.16
TOTAL ENERGY COSTS $828,552
RECOMMENDED SAVINGS* $169,776 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,660
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #4 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #4 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$272
Cost:
$450
$214 5,307 $58 7 - - - - $214
5,307
kWh
$58
7
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4154 AVOID REWINDING MOTORS MORE THAN TWICE Savings:
$8,087
Cost:
$6,437
$6,362 157,487 $1,725 220 - - - - $6,362
157,487
kWh
$1,725
220
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,084
Cost:
$1,559
$3,213 79,530 $871 111 - - - - $3,213
79,530
kWh
$871
111
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$44,656
Cost:
$40,000
- - - - $44,656 13,955 - - -
-
kWh
-
-
kW-months/year
$44,656
13,955
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,013
Cost:
$35,000
$15,209 376,450 $4,286 546 $(-5,482) (-1,713) $(-1,000) - $15,209
376,450
kWh
$4,286
546
kW-months/year
$(-5,482)
(-1,713)
MMBtu
$(-1,000)
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,104
Cost:
$17,000
- - - - $9,104 2,817 - - -
-
kWh
-
-
kW-months/year
$9,104
2,817
MMBtu
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$90,560
Cost:
$35,000
- - $90,560 - - - - - -
-
kWh
$90,560
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$169,776
Cost:
$135,446
$24,998 618,774 $97,500 884 $48,278 15,059 $(-1,000) - $24,998
618,774
kWh
$97,500
884
kW-months/year
$48,278
15,059
MMBtu
$(-1,000)
-
$
TOTAL IMPLEMENTED Savings:
$111,660
Cost:
$76,437
$21,571 533,937 $96,571 766 $(-5,482) (-1,713) $(-1,000) - $21,571
533,937
kWh
$96,571
766
kW-months/year
$(-5,482)
(-1,713)
MMBtu
$(-1,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #4 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #4 Administrative Changes