IAC Assessment: NC0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2001
Principal Product Chromium based chemicals
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $100,000,000-$500,000,000
# of Employees 224
Plant Area (Sq.Ft.) 50,000
Annual Production 200,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,217,605 93,823,888 kWh $0.02
Electricity Demand $1,636,806 102,219 kW-months/year $16.01
Electricity Fees $1,523 - $ -
Fuel Oil #6 $10,000,000 2,884,615 MMBtu $3.47
TOTAL ENERGY COSTS $13,855,934
RECOMMENDED SAVINGS* $363,853 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $234,560
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,595
Cost:
$2,000
$946 40,077 $1,649 110 - - - - $946
40,077
kWh
$1,649
110
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$82,133
Cost:
$143,940
$(-3,330) (-141,120) $(-3,030) (-202) $88,493 25,502 - - $(-3,330)
(-141,120)
kWh
$(-3,030)
(-202)
kW-months/year
$88,493
25,502
MMBtu
-
-
$
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$158,850
Cost:
$100,000
- - - - $158,850 48,750 - - -
-
kWh
-
-
kW-months/year
$158,850
48,750
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$44,160
Cost:
$90,000
- - - - $44,160 12,725 - - -
-
kWh
-
-
kW-months/year
$44,160
12,725
MMBtu
-
-
$
05: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$3,000
Cost:
$5,000
- - - - - - $3,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,000
-
$
06: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$8,000
Cost:
$500
- - - - - - $8,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,000
-
$
07: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$65,115
Cost:
$86,000
- - - - $65,115 18,765 - - -
-
kWh
-
-
kW-months/year
$65,115
18,765
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$363,853
Cost:
$427,440
$(-2,384) (-101,043) $(-1,381) (-92) $356,618 105,742 $11,000 - $(-2,384)
(-101,043)
kWh
$(-1,381)
(-92)
kW-months/year
$356,618
105,742
MMBtu
$11,000
-
$
TOTAL IMPLEMENTED Savings:
$234,560
Cost:
$188,500
$946 40,077 $1,649 110 $223,965 67,515 $8,000 - $946
40,077
kWh
$1,649
110
kW-months/year
$223,965
67,515
MMBtu
$8,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes