Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2001 |
Principal Product | Fire suppressant systems |
NAICS | n/a |
SIC | 3829 - Measuring & Controlling Devices, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 793,250 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $171,760 | 5,204,850 | kWh | $0.03 |
Electricity Demand | $188,771 | 9,400 | kW-months/year | $20.08 |
Electricity Fees | $6,800 | - | $ | - |
TOTAL ENERGY COSTS | $367,331 | |||
RECOMMENDED SAVINGS* | $52,485 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,603 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $14,086 Cost: $7,500 |
$12,672 | 384,000 | $14,784 | 768 | $(-12,870) | (-1,638) | $(-500) | - |
$12,672 384,000 kWh |
$14,784 768 kW-months/year |
$(-12,870) (-1,638) MMBtu |
$(-500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $16,136 Cost: $45,000 |
$3,036 | 92,000 | $17,940 | 1,104 | $(-3,840) | (-463) | $(-1,000) | - |
$3,036 92,000 kWh |
$17,940 1,104 kW-months/year |
$(-3,840) (-463) MMBtu |
$(-1,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,746 Cost: $5,000 |
$(-792) | (-24,000) | $(-924) | (-48) | $3,462 | 436 | - | - |
$(-792) (-24,000) kWh |
$(-924) (-48) kW-months/year |
$3,462 436 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $19,065 Cost: $40,000 |
$16,620 | 503,644 | $2,445 | 815 | - | - | - | - |
$16,620 503,644 kWh |
$2,445 815 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,339 Cost: $1,690 |
$618 | 18,720 | $721 | 37 | - | - | - | - |
$618 18,720 kWh |
$721 37 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $113 Cost: $300 |
$52 | 1,573 | $61 | 3 | - | - | - | - |
$52 1,573 kWh |
$61 3 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,485 Cost: $99,490 |
$32,206 | 975,937 | $35,027 | 2,679 | $(-13,248) | (-1,665) | $(-1,500) | - | $32,206 975,937 kWh |
$35,027 2,679 kW-months/year |
$(-13,248) (-1,665) MMBtu |
$(-1,500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,603 Cost: $49,490 |
$29,962 | 907,937 | $18,011 | 1,623 | $(-12,870) | (-1,638) | $(-500) | - | $29,962 907,937 kWh |
$18,011 1,623 kW-months/year |
$(-12,870) (-1,638) MMBtu |
$(-500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |