IAC logo
IAC Assessment: NC0228
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0228
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2002
Principal Product Blood components
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales >$500,000,000
# of Employees 2,000
Plant Area (Sq.Ft.) 1,000,000
Annual Production 582 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,828,104 76,860,494 kWh $0.05
Electricity Demand $1,716,603 105,241 kW-months/year $16.31
Electricity Fees $9,637 - $ -
Natural Gas $1,107,284 267,966 MMBtu $4.13
Fuel Oil #2 $133,584 18,521 MMBtu $7.21
Fuel Oil #4 $215,982 40,960 MMBtu $5.27
TOTAL ENERGY COSTS $7,343,161
RECOMMENDED SAVINGS* $598,823 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ %
01: 4.125 Savings:
$296,000
Cost:
$75,000
- - - - - - - - $(-4,000) - $300,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-4,000)
-
$
$300,000
-
%
02: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$41,667
Cost:
$10,600
- - - - - - - - $41,667 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$41,667
-
$
-
-
%
03: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$173,756
Cost:
$88,000
$45,991 1,690,348 $29,100 2,165 $98,665 20,343 - - - - - - $45,991
1,690,348
kWh
$29,100
2,165
kW-months/year
$98,665
20,343
MMBtu
-
-
Tgal
-
-
$
-
-
%
04: 2.5194 REDESIGN PROCESS Savings:
$74,974
Cost:
$100,000
$(-53,178) (-1,969,561) $(-40,546) (-2,699) - - $(-29,315) (-7,574,946) $198,013 - - - $(-53,178)
(-1,969,561)
kWh
$(-40,546)
(-2,699)
kW-months/year
-
-
MMBtu
$(-29,315)
(-7,574,946)
Tgal
$198,013
-
$
-
-
%
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$12,426
Cost:
$39,808
$(-388) (-14,379) $(-296) 20 - - $1,757 454,118 $11,353 - - - $(-388)
(-14,379)
kWh
$(-296)
20
kW-months/year
-
-
MMBtu
$1,757
454,118
Tgal
$11,353
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$598,823
Cost:
$313,408
$(-7,575) (-293,592) $(-11,742) (-514) $98,665 20,343 $(-27,558) (-7,120,828) $247,033 - $300,000 - $(-7,575)
(-293,592)
kWh
$(-11,742)
(-514)
kW-months/year
$98,665
20,343
MMBtu
$(-27,558)
(-7,120,828)
Tgal
$247,033
-
$
$300,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ %
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Increase in Production