Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2002 |
Principal Product | Blood components |
NAICS | n/a |
SIC | 2834 - Pharmaceutical Preparations |
Sales | >$500,000,000 |
# of Employees | 2,000 |
Plant Area (Sq.Ft.) | 1,000,000 |
Annual Production | 582 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,828,104 | 76,860,494 | kWh | $0.05 |
Electricity Demand | $1,716,603 | 105,241 | kW-months/year | $16.31 |
Electricity Fees | $9,637 | - | $ | - |
Natural Gas | $1,107,284 | 267,966 | MMBtu | $4.13 |
Fuel Oil #2 | $133,584 | 18,521 | MMBtu | $7.21 |
Fuel Oil #4 | $215,982 | 40,960 | MMBtu | $5.27 |
TOTAL ENERGY COSTS | $7,343,161 | |||
RECOMMENDED SAVINGS* | $598,823 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.125 |
Savings: $296,000 Cost: $75,000 |
- | - | - | - | - | - | - | - | $(-4,000) | - | $300,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$(-4,000) - $ |
$300,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $41,667 Cost: $10,600 |
- | - | - | - | - | - | - | - | $41,667 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$41,667 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $173,756 Cost: $88,000 |
$45,991 | 1,690,348 | $29,100 | 2,165 | $98,665 | 20,343 | - | - | - | - | - | - |
$45,991 1,690,348 kWh |
$29,100 2,165 kW-months/year |
$98,665 20,343 MMBtu |
- - Tgal |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.5194 REDESIGN PROCESS |
Savings: $74,974 Cost: $100,000 |
$(-53,178) | (-1,969,561) | $(-40,546) | (-2,699) | - | - | $(-29,315) | (-7,574,946) | $198,013 | - | - | - |
$(-53,178) (-1,969,561) kWh |
$(-40,546) (-2,699) kW-months/year |
- - MMBtu |
$(-29,315) (-7,574,946) Tgal |
$198,013 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $12,426 Cost: $39,808 |
$(-388) | (-14,379) | $(-296) | 20 | - | - | $1,757 | 454,118 | $11,353 | - | - | - |
$(-388) (-14,379) kWh |
$(-296) 20 kW-months/year |
- - MMBtu |
$1,757 454,118 Tgal |
$11,353 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $598,823 Cost: $313,408 |
$(-7,575) | (-293,592) | $(-11,742) | (-514) | $98,665 | 20,343 | $(-27,558) | (-7,120,828) | $247,033 | - | $300,000 | - | $(-7,575) (-293,592) kWh |
$(-11,742) (-514) kW-months/year |
$98,665 20,343 MMBtu |
$(-27,558) (-7,120,828) Tgal |
$247,033 - $ |
$300,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Increase in Production |