IAC Assessment: NC0236
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0236
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2002
Principal Product Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 150,000
Annual Production 70,000 Thousand Feet
Production Hrs. Annual 2,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $389,985 7,308,573 kWh $0.05
Electricity Demand $160,196 33,584 kW-months/year $4.77
Electricity Fees $14,781 - $ -
TOTAL ENERGY COSTS $564,962
RECOMMENDED SAVINGS* $25,824 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,534
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Water Disposal Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,684
Cost:
$6,000
$2,185 41,950 $938 197 $(-1,439) (-288,000) - - - - $2,185
41,950
kWh
$938
197
kW-months/year
$(-1,439)
(-288,000)
Tgal
-
-
$
-
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,419
Cost:
$8,200
$2,876 53,903 $1,543 324 - - - - - - $2,876
53,903
kWh
$1,543
324
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$19,606
Cost:
$550
- - - - - - $(-3,750) - $23,356 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$(-3,750)
-
$
$23,356
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$115
Cost:
$260
$75 1,400 $40 8 - - - - - - $75
1,400
kWh
$40
8
kW-months/year
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,824
Cost:
$15,010
$5,136 97,253 $2,521 529 $(-1,439) (-288,000) $(-3,750) - $23,356 - $5,136
97,253
kWh
$2,521
529
kW-months/year
$(-1,439)
(-288,000)
Tgal
$(-3,750)
-
$
$23,356
-
$
TOTAL IMPLEMENTED Savings:
$4,534
Cost:
$8,460
$2,951 55,303 $1,583 332 - - - - - - $2,951
55,303
kWh
$1,583
332
kW-months/year
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Water Disposal Personnel Changes Primary Raw Material