IAC logo
IAC Assessment: NC0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2002
Principal Product Laminated board
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 12,500 Thousand Feet
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,466 1,766,700 kWh $0.05
Electricity Demand $30,476 6,969 kW-months/year $4.37
LPG $29,472 3,357 MMBtu $8.78
TOTAL ENERGY COSTS $144,414
RECOMMENDED SAVINGS* $167,807 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT Savings:
$142,297
Cost:
$262,500
$44,530 931,400 $11,179 2,713 $21,783 1,737 $64,805 36,000,000 - - - - $44,530
931,400
kWh
$11,179
2,713
kW-months/year
$21,783
1,737
MMBtu
$64,805
36,000,000
lb
-
-
$
-
-
$
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$7,452
Cost:
$20,000
$6,110 127,788 $1,342 326 - - - - - - - - $6,110
127,788
kWh
$1,342
326
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,574
Cost:
-
- - $15,574 3,780 - - - - $(-10,000) - - - -
-
kWh
$15,574
3,780
kW-months/year
-
-
MMBtu
-
-
lb
$(-10,000)
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,991
Cost:
$1,000
- - - - $3,991 455 - - - - - - -
-
kWh
-
-
kW-months/year
$3,991
455
MMBtu
-
-
lb
-
-
$
-
-
$
05: 4.5150 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$7,000
Cost:
$6,320
- - - - - - - - $3,000 - $4,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$3,000
-
$
$4,000
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$893
Cost:
$1,590
$709 14,838 $184 44 - - - - - - - - $709
14,838
kWh
$184
44
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$600
Cost:
-
$396 8,280 $204 50 - - - - - - - - $396
8,280
kWh
$204
50
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$167,807
Cost:
$291,410
$51,745 1,082,306 $28,483 6,913 $25,774 2,192 $64,805 36,000,000 $(-7,000) - $4,000 - $51,745
1,082,306
kWh
$28,483
6,913
kW-months/year
$25,774
2,192
MMBtu
$64,805
36,000,000
lb
$(-7,000)
-
$
$4,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Primary Raw Material