Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2002 |
Principal Product | Laminated board |
NAICS | n/a |
SIC | 2493 - Reconstituted Wood Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 12,500 Thousand Feet |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $84,466 | 1,766,700 | kWh | $0.05 |
Electricity Demand | $30,476 | 6,969 | kW-months/year | $4.37 |
LPG | $29,472 | 3,357 | MMBtu | $8.78 |
TOTAL ENERGY COSTS | $144,414 | |||
RECOMMENDED SAVINGS* | $167,807 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT |
Savings: $142,297 Cost: $262,500 |
$44,530 | 931,400 | $11,179 | 2,713 | $21,783 | 1,737 | $64,805 | 36,000,000 | - | - | - | - |
$44,530 931,400 kWh |
$11,179 2,713 kW-months/year |
$21,783 1,737 MMBtu |
$64,805 36,000,000 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $7,452 Cost: $20,000 |
$6,110 | 127,788 | $1,342 | 326 | - | - | - | - | - | - | - | - |
$6,110 127,788 kWh |
$1,342 326 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,574 Cost: - |
- | - | $15,574 | 3,780 | - | - | - | - | $(-10,000) | - | - | - |
- - kWh |
$15,574 3,780 kW-months/year |
- - MMBtu |
- - lb |
$(-10,000) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,991 Cost: $1,000 |
- | - | - | - | $3,991 | 455 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,991 455 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $7,000 Cost: $6,320 |
- | - | - | - | - | - | - | - | $3,000 | - | $4,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$3,000 - $ |
$4,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $893 Cost: $1,590 |
$709 | 14,838 | $184 | 44 | - | - | - | - | - | - | - | - |
$709 14,838 kWh |
$184 44 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $600 Cost: - |
$396 | 8,280 | $204 | 50 | - | - | - | - | - | - | - | - |
$396 8,280 kWh |
$204 50 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $167,807 Cost: $291,410 |
$51,745 | 1,082,306 | $28,483 | 6,913 | $25,774 | 2,192 | $64,805 | 36,000,000 | $(-7,000) | - | $4,000 | - | $51,745 1,082,306 kWh |
$28,483 6,913 kW-months/year |
$25,774 2,192 MMBtu |
$64,805 36,000,000 lb |
$(-7,000) - $ |
$4,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |