IAC Assessment: NC0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2003
Principal Product Bimetallic plasticating cylinders
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 40,000
Annual Production 3,000 Pieces
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,588 1,700,600 kWh $0.03
Electricity Demand $35,416 5,750 kW-months/year $6.16
Electricity Fees $5,870 - $ -
Natural Gas $54,154 8,677 MMBtu $6.24
TOTAL ENERGY COSTS $146,028
RECOMMENDED SAVINGS* $55,459 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,471
Cost:
$10,000
- - - - $10,471 1,678 - - -
-
kWh
-
-
kW-months/year
$10,471
1,678
MMBtu
-
-
$
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$33,773
Cost:
$55,000
$(-4,812) (-161,750) $(-4,783) (-776) $43,368 6,950 - - $(-4,812)
(-161,750)
kWh
$(-4,783)
(-776)
kW-months/year
$43,368
6,950
MMBtu
-
-
$
03: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$4,320
Cost:
$5,653
$1,152 38,711 - - $4,573 733 $(-1,405) - $1,152
38,711
kWh
-
-
kW-months/year
$4,573
733
MMBtu
$(-1,405)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,339
Cost:
$50
$714 24,000 $295 48 - - $2,330 - $714
24,000
kWh
$295
48
kW-months/year
-
-
MMBtu
$2,330
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,272
Cost:
$5,225
$1,607 54,000 $665 108 - - - - $1,607
54,000
kWh
$665
108
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,284
Cost:
$800
- - - - $1,284 205 - - -
-
kWh
-
-
kW-months/year
$1,284
205
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$55,459
Cost:
$76,728
$(-1,339) (-45,039) $(-3,823) (-620) $59,696 9,566 $925 - $(-1,339)
(-45,039)
kWh
$(-3,823)
(-620)
kW-months/year
$59,696
9,566
MMBtu
$925
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost