IAC Assessment: NC0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2003
Principal Product Rubber hoses and products
NAICS 326220 - Rubber and Plastics Hoses and Belting Manufacturing
SIC 3059 -
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 173,000
Annual Production 3,750,000 Pounds
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,096 4,788,000 kWh $0.04
Electricity Demand $69,258 16,296 kW-months/year $4.25
Electricity Fees $8,577 - $ -
Natural Gas $223,639 41,598 MMBtu $5.38
Fuel Oil #6 $85,827 16,807 MMBtu $5.11
TOTAL ENERGY COSTS $588,397
RECOMMENDED SAVINGS* $60,811 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ Tgal $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$23,793
Cost:
$7,000
- - $23,177 4,728 $616 - - - - - - - - - - - -
-
kWh
$23,177
4,728
kW-months/year
$616
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$13,226
Cost:
$24,506
- - - - - - $5,840 1,187 $2,386 485 $5,000 734,380 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,840
1,187
MMBtu
$2,386
485
MMBtu
$5,000
734,380
Tgal
-
-
$
-
-
$
03: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$7,348
Cost:
$3,525
- - - - - - $3,576 703 - - $1,417 471,055 - - $2,355 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,576
703
MMBtu
-
-
MMBtu
$1,417
471,055
Tgal
-
-
$
$2,355
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,206
Cost:
$1,100
- - - - - - $5,206 1,022 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,206
1,022
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$7,094
Cost:
$1,000
- - - - - - $7,094 1,387 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,094
1,387
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,361
Cost:
-
$2,361 62,664 - - - - - - - - - - - - - - $2,361
62,664
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,469
Cost:
$300
$2,082 49,561 $287 68 - - - - - - - - $(-600) - $(-300) - $2,082
49,561
kWh
$287
68
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$(-600)
-
$
$(-300)
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$214
Cost:
$50
$214 5,112 - - - - - - - - - - - - - - $214
5,112
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$100
Cost:
$89
$100 2,400 - - - - - - - - - - - - - - $100
2,400
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$60,811
Cost:
$37,570
$4,757 119,737 $23,464 4,796 $616 - $21,716 4,299 $2,386 485 $6,417 1,205,435 $(-600) - $2,055 - $4,757
119,737
kWh
$23,464
4,796
kW-months/year
$616
-
$
$21,716
4,299
MMBtu
$2,386
485
MMBtu
$6,417
1,205,435
Tgal
$(-600)
-
$
$2,055
-
$
TOTAL IMPLEMENTED Savings:
$55,605
Cost:
$36,470
$4,757 119,737 $23,464 4,796 $616 - $16,510 3,277 $2,386 485 $6,417 1,205,435 $(-600) - $2,055 - $4,757
119,737
kWh
$23,464
4,796
kW-months/year
$616
-
$
$16,510
3,277
MMBtu
$2,386
485
MMBtu
$6,417
1,205,435
Tgal
$(-600)
-
$
$2,055
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Administrative Changes