IAC logo
IAC Assessment: NC0268
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0268
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2003
Principal Product Accessory products for building industry
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $50,000,000-$100,000,000
# of Employees 290
Plant Area (Sq.Ft.) 450,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $228,091 4,716,960 kWh $0.05
Electricity Demand $55,880 11,383 kW-months/year $4.91
Electricity Fees $9,138 - $ -
LPG $131,505 16,290 MMBtu $8.07
TOTAL ENERGY COSTS $424,614
RECOMMENDED SAVINGS* $51,895 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $693
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand LPG Water Disposal Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$29,974
Cost:
$26,350
$(-370) (-8,400) $(-256) (-50) - - - - $33,600 - $(-3,000) - $(-370)
(-8,400)
kWh
$(-256)
(-50)
kW-months/year
-
-
MMBtu
-
-
Tgal
$33,600
-
$
$(-3,000)
-
$
02: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$9,563
Cost:
$8,000
- - - - $9,563 1,185 - - - - - - -
-
kWh
-
-
kW-months/year
$9,563
1,185
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$10,491
Cost:
$2,000
- - - - $10,491 1,300 - - - - - - -
-
kWh
-
-
kW-months/year
$10,491
1,300
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$693
Cost:
$500
$3,485 79,200 $808 158 - - - - $(-2,400) - $(-1,200) - $3,485
79,200
kWh
$808
158
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-2,400)
-
$
$(-1,200)
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$162
Cost:
$329
- - - - $162 20 - - - - - - -
-
kWh
-
-
kW-months/year
$162
20
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER Savings:
$1,012
Cost:
$300
- - - - - - $1,012 120,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,012
120,000
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$51,895
Cost:
$37,479
$3,115 70,800 $552 108 $20,216 2,505 $1,012 120,000 $31,200 - $(-4,200) - $3,115
70,800
kWh
$552
108
kW-months/year
$20,216
2,505
MMBtu
$1,012
120,000
Tgal
$31,200
-
$
$(-4,200)
-
$
TOTAL IMPLEMENTED Savings:
$693
Cost:
$500
$3,485 79,200 $808 158 - - - - $(-2,400) - $(-1,200) - $3,485
79,200
kWh
$808
158
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-2,400)
-
$
$(-1,200)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand LPG Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand LPG Water Disposal Personnel Changes Administrative Changes