Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2004 |
Principal Product | Pharmaceutical contrast media |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | >$500,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 370 Thousand Gallons |
Production Hrs. Annual | 5,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $270,979 | 9,767,003 | kWh | $0.03 |
Electricity Demand | $184,319 | 17,709 | kW-months/year | $10.41 |
Electricity Fees | $12,364 | - | $ | - |
Natural Gas | $106,076 | 17,142 | MMBtu | $6.19 |
TOTAL ENERGY COSTS | $573,738 | |||
RECOMMENDED SAVINGS* | $36,537 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,658 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $22,500 Cost: $18,300 |
- | - | - | - | - | - | - | - | $22,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$22,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $7,112 Cost: $6,000 |
$(-157) | (-5,400) | $(-29) | (-11) | $5,414 | 876 | $1,884 | 600,000 | - | - |
$(-157) (-5,400) kWh |
$(-29) (-11) kW-months/year |
$5,414 876 MMBtu |
$1,884 600,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $1,469 Cost: $1,200 |
- | - | - | - | $904 | 146 | $565 | 180,000 | - | - |
- - kWh |
- - kW-months/year |
$904 146 MMBtu |
$565 180,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,379 Cost: $6,899 |
$3,446 | 146,119 | $933 | 351 | - | - | - | - | - | - |
$3,446 146,119 kWh |
$933 351 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,077 Cost: $356 |
$1,077 | 37,128 | - | - | - | - | - | - | - | - |
$1,077 37,128 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,537 Cost: $32,755 |
$4,366 | 177,847 | $904 | 340 | $6,318 | 1,022 | $2,449 | 780,000 | $22,500 | - | $4,366 177,847 kWh |
$904 340 kW-months/year |
$6,318 1,022 MMBtu |
$2,449 780,000 Tgal |
$22,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,658 Cost: $7,556 |
$920 | 31,728 | $(-29) | (-11) | $6,318 | 1,022 | $2,449 | 780,000 | - | - | $920 31,728 kWh |
$(-29) (-11) kW-months/year |
$6,318 1,022 MMBtu |
$2,449 780,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes |