Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Polyester fiberfill blankets
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 119
Plant Area (Sq.Ft.) 115,000
Annual Production 34,000,000 Pounds
Production Hrs. Annual 5,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,745 5,178,616 kWh $0.03
Electricity Demand $120,692 12,929 kW-months/year $9.33
Electricity Fees $8,833 - $ -
Natural Gas $400,829 51,352 MMBtu $7.81
TOTAL ENERGY COSTS $680,099
RECOMMENDED SAVINGS* $16,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,262
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$10,282
Cost:
$9,879
$5,986 207,145 - - $4,296 550 - - - - $5,986
207,145
kWh
-
-
kW-months/year
$4,296
550
MMBtu
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,536
Cost:
$1,096
$860 29,774 $676 71 - - - - - - $860
29,774
kWh
$676
71
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$615
Cost:
$100
$1,018 35,226 $797 85 - - $(-800) - $(-400) - $1,018
35,226
kWh
$797
85
kW-months/year
-
-
MMBtu
$(-800)
-
$
$(-400)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,732
Cost:
$700
$972 33,626 $760 81 - - - - - - $972
33,626
kWh
$760
81
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,915
Cost:
$750
$464 16,059 $1,451 154 - - - - - - $464
16,059
kWh
$1,451
154
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$803
Cost:
$1,570
$448 15,514 $355 38 - - - - - - $448
15,514
kWh
$355
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,883
Cost:
$14,095
$9,748 337,344 $4,039 429 $4,296 550 $(-800) - $(-400) - $9,748
337,344
kWh
$4,039
429
kW-months/year
$4,296
550
MMBtu
$(-800)
-
$
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$4,262
Cost:
$1,550
$2,454 84,911 $3,008 320 - - $(-800) - $(-400) - $2,454
84,911
kWh
$3,008
320
kW-months/year
-
-
MMBtu
$(-800)
-
$
$(-400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost