IAC Assessment: NC0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Paper packaging materials
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 54,000
Annual Production 125,000 Thousand Feet
Production Hrs. Annual 4,800
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,114 2,325,488 kWh $0.03
Electricity Demand $60,069 6,145 kW-months/year $9.78
Electricity Fees $432 - $ -
Natural Gas $3,435 328 MMBtu $10.47
TOTAL ENERGY COSTS $169,050
RECOMMENDED SAVINGS* $32,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,873
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ $
01: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$21,873
Cost:
$25,000
$(-1,689) (-60,318) $(-1,438) (-151) $30,000 8,250 $(-5,000) - $(-1,689)
(-60,318)
kWh
$(-1,438)
(-151)
kW-months/year
$30,000
8,250
gal
$(-5,000)
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,527
Cost:
-
$(-89) (-3,161) $10,699 1,125 - - $(-1,083) - $(-89)
(-3,161)
kWh
$10,699
1,125
kW-months/year
-
-
gal
$(-1,083)
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$230
Cost:
$154
$124 4,412 $106 11 - - - - $124
4,412
kWh
$106
11
kW-months/year
-
-
gal
-
-
$
04: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$972
Cost:
$1,000
$430 15,341 $542 46 - - - - $430
15,341
kWh
$542
46
kW-months/year
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$32,602
Cost:
$26,154
$(-1,224) (-43,726) $9,909 1,031 $30,000 8,250 $(-6,083) - $(-1,224)
(-43,726)
kWh
$9,909
1,031
kW-months/year
$30,000
8,250
gal
$(-6,083)
-
$
TOTAL IMPLEMENTED Savings:
$21,873
Cost:
$25,000
$(-1,689) (-60,318) $(-1,438) (-151) $30,000 8,250 $(-5,000) - $(-1,689)
(-60,318)
kWh
$(-1,438)
(-151)
kW-months/year
$30,000
8,250
gal
$(-5,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes