IAC Assessment: NC0290
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0290
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Body Panels for Heavy Duty Trucks
NAICS 336370 - Motor Vehicle Metal Stamping
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 250,000
Annual Production 927,000 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $506,488 19,147,200 kWh $0.03
Electricity Demand $296,830 35,698 kW-months/year $8.32
Natural Gas $570,470 77,231 MMBtu $7.39
TOTAL ENERGY COSTS $1,373,788
RECOMMENDED SAVINGS* $178,188 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $156,661
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT Savings:
$145,703
Cost:
$276,000
$5,171 195,862 $(-8,468) (-1,018) - - $165,600 - $(-16,600) - $5,171
195,862
kWh
$(-8,468)
(-1,018)
kW-months/year
-
-
MMBtu
$165,600
-
$
$(-16,600)
-
$
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$9,371
Cost:
$4,079
- - - - $9,371 1,268 - - - - -
-
kWh
-
-
kW-months/year
$9,371
1,268
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,085
Cost:
$5,500
- - - - $8,085 1,094 - - - - -
-
kWh
-
-
kW-months/year
$8,085
1,094
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,865
Cost:
$9,174
- - - - $3,665 496 $(-800) - - - -
-
kWh
-
-
kW-months/year
$3,665
496
MMBtu
$(-800)
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,206
Cost:
$2,269
$740 28,029 $466 56 - - - - - - $740
28,029
kWh
$466
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$612
Cost:
$100
$1,112 42,120 $700 84 - - $(-800) - $(-400) - $1,112
42,120
kWh
$700
84
kW-months/year
-
-
MMBtu
$(-800)
-
$
$(-400)
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$10,346
Cost:
$2,533
- - - - $10,346 1,400 - - - - -
-
kWh
-
-
kW-months/year
$10,346
1,400
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$178,188
Cost:
$299,655
$7,023 266,011 $(-7,302) (-878) $31,467 4,258 $164,000 - $(-17,000) - $7,023
266,011
kWh
$(-7,302)
(-878)
kW-months/year
$31,467
4,258
MMBtu
$164,000
-
$
$(-17,000)
-
$
TOTAL IMPLEMENTED Savings:
$156,661
Cost:
$278,633
$6,283 237,982 $(-7,768) (-934) $10,346 1,400 $164,800 - $(-17,000) - $6,283
237,982
kWh
$(-7,768)
(-934)
kW-months/year
$10,346
1,400
MMBtu
$164,800
-
$
$(-17,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost