Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2004 |
Principal Product | Body Panels for Heavy Duty Trucks |
NAICS | 336370 - Motor Vehicle Metal Stamping |
SIC | 3465 - Automotive Stampings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 927,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $506,488 | 19,147,200 | kWh | $0.03 |
Electricity Demand | $296,830 | 35,698 | kW-months/year | $8.32 |
Natural Gas | $570,470 | 77,231 | MMBtu | $7.39 |
TOTAL ENERGY COSTS | $1,373,788 | |||
RECOMMENDED SAVINGS* | $178,188 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $156,661 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT |
Savings: $145,703 Cost: $276,000 |
$5,171 | 195,862 | $(-8,468) | (-1,018) | - | - | $165,600 | - | $(-16,600) | - |
$5,171 195,862 kWh |
$(-8,468) (-1,018) kW-months/year |
- - MMBtu |
$165,600 - $ |
$(-16,600) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $9,371 Cost: $4,079 |
- | - | - | - | $9,371 | 1,268 | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,371 1,268 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,085 Cost: $5,500 |
- | - | - | - | $8,085 | 1,094 | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,085 1,094 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,865 Cost: $9,174 |
- | - | - | - | $3,665 | 496 | $(-800) | - | - | - |
- - kWh |
- - kW-months/year |
$3,665 496 MMBtu |
$(-800) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,206 Cost: $2,269 |
$740 | 28,029 | $466 | 56 | - | - | - | - | - | - |
$740 28,029 kWh |
$466 56 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $612 Cost: $100 |
$1,112 | 42,120 | $700 | 84 | - | - | $(-800) | - | $(-400) | - |
$1,112 42,120 kWh |
$700 84 kW-months/year |
- - MMBtu |
$(-800) - $ |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $10,346 Cost: $2,533 |
- | - | - | - | $10,346 | 1,400 | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,346 1,400 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $178,188 Cost: $299,655 |
$7,023 | 266,011 | $(-7,302) | (-878) | $31,467 | 4,258 | $164,000 | - | $(-17,000) | - | $7,023 266,011 kWh |
$(-7,302) (-878) kW-months/year |
$31,467 4,258 MMBtu |
$164,000 - $ |
$(-17,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $156,661 Cost: $278,633 |
$6,283 | 237,982 | $(-7,768) | (-934) | $10,346 | 1,400 | $164,800 | - | $(-17,000) | - | $6,283 237,982 kWh |
$(-7,768) (-934) kW-months/year |
$10,346 1,400 MMBtu |
$164,800 - $ |
$(-17,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |