IAC Assessment: NC0292
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0292
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Mailing envelopes
NAICS 322230 - Stationery Product Manufacturing
SIC 2677 - Envelopes
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 133,436
Annual Production 1,100,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,568 5,586,000 kWh $0.02
Electricity Demand $89,840 10,772 kW-months/year $8.34
Electricity Fees $14,400 - $ -
Natural Gas $39,789 3,921 MMBtu $10.15
TOTAL ENERGY COSTS $252,490
RECOMMENDED SAVINGS* $90,384 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost By-product Production Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost By-product Production Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $ $ $ $ %
01: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$53,200
Cost:
$10,376
- - - - - - - - - - $(-36,800) - $(-90,000) - - - - - $180,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$(-36,800)
-
$
$(-90,000)
-
$
-
-
$
-
-
$
$180,000
-
%
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$17,751
Cost:
$16,000
- - - - - - $17,751 2,370,000 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,751
2,370,000
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,368
Cost:
$6,692
$2,595 166,243 $2,773 332 - - - - - - - - - - - - - - - - $2,595
166,243
kWh
$2,773
332
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,211
Cost:
$2,738
- - - - $8,211 809 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,211
809
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
05: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$4,313
Cost:
$6,553
$314 20,129 - - $3,999 394 - - - - - - - - - - - - - - $314
20,129
kWh
-
-
kW-months/year
$3,999
394
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,084
Cost:
$720
$524 33,600 $560 67 - - - - - - - - - - - - - - - - $524
33,600
kWh
$560
67
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
07: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$297
Cost:
$750
$297 19,002 - - - - - - - - - - - - - - - - - - $297
19,002
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$115
Cost:
$100
$549 35,152 $586 70 - - - - - - $(-720) - - - $(-300) - - - - - $549
35,152
kWh
$586
70
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$(-720)
-
$
-
-
$
$(-300)
-
$
-
-
$
-
-
%
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$45
Cost:
$50
- - - - - - - - $142 10,400 $(-144) - - - - - $47 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$142
10,400
lb
$(-144)
-
$
-
-
$
-
-
$
$47
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$90,384
Cost:
$43,979
$4,279 274,126 $3,919 469 $12,210 1,203 $17,751 2,370,000 $142 10,400 $(-37,664) - $(-90,000) - $(-300) - $47 - $180,000 - $4,279
274,126
kWh
$3,919
469
kW-months/year
$12,210
1,203
MMBtu
$17,751
2,370,000
Tgal
$142
10,400
lb
$(-37,664)
-
$
$(-90,000)
-
$
$(-300)
-
$
$47
-
$
$180,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost By-product Production Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost By-product Production Increase in Production