IAC logo
IAC Assessment: NC0294
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0294
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Socks
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2252 - Hosiery, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 100,000
Annual Production 15,600,000 Pieces
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,746 4,609,500 kWh $0.03
Electricity Demand $84,891 8,928 kW-months/year $9.51
Electricity Fees $6,544 - $ -
Natural Gas $421,428 54,844 MMBtu $7.68
TOTAL ENERGY COSTS $877,838
RECOMMENDED SAVINGS* $54,359 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,786
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$19,084
Cost:
$2,780
$(-266) (-9,360) $(-147) (-16) $6,298 820 $13,199 4,061,190 - - - - $(-266)
(-9,360)
kWh
$(-147)
(-16)
kW-months/year
$6,298
820
MMBtu
$13,199
4,061,190
Tgal
-
-
$
-
-
$
02: 4.451 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$17,395
Cost:
$5,000
$(-1,274) (-55,200) - - $8,583 1,118 $10,086 3,103,375 - - - - $(-1,274)
(-55,200)
kWh
-
-
kW-months/year
$8,583
1,118
MMBtu
$10,086
3,103,375
Tgal
-
-
$
-
-
$
03: 2.5194 REDESIGN PROCESS Savings:
$9,178
Cost:
$2,200
$2,346 81,736 $1,283 137 $5,549 723 - - - - - - $2,346
81,736
kWh
$1,283
137
kW-months/year
$5,549
723
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$600
Cost:
$100
$1,198 42,192 $662 70 - - - - $(-960) - $(-300) - $1,198
42,192
kWh
$662
70
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-960)
-
$
$(-300)
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,102
Cost:
$9,225
- - - - $8,102 1,055 - - - - - - -
-
kWh
-
-
kW-months/year
$8,102
1,055
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$54,359
Cost:
$19,305
$2,004 59,368 $1,798 191 $28,532 3,716 $23,285 7,164,565 $(-960) - $(-300) - $2,004
59,368
kWh
$1,798
191
kW-months/year
$28,532
3,716
MMBtu
$23,285
7,164,565
Tgal
$(-960)
-
$
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$27,786
Cost:
$12,105
$932 32,832 $515 54 $14,400 1,875 $13,199 4,061,190 $(-960) - $(-300) - $932
32,832
kWh
$515
54
kW-months/year
$14,400
1,875
MMBtu
$13,199
4,061,190
Tgal
$(-960)
-
$
$(-300)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost