Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2004 |
Principal Product | Socks |
NAICS | 315110 - Hosiery and Sock Mills |
SIC | 2252 - Hosiery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 65,500 |
Annual Production | 90,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $158,162 | 5,518,254 | kWh | $0.03 |
Electricity Demand | $102,358 | 10,985 | kW-months/year | $9.32 |
Electricity Fees | $10,963 | - | $ | - |
LPG | $40,498 | 3,727 | MMBtu | $10.87 |
TOTAL ENERGY COSTS | $311,981 | |||
RECOMMENDED SAVINGS* | $10,009 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,165 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,880 Cost: $100 |
$2,831 | 98,640 | $1,549 | 164 | - | - | $(-1,200) | - | $(-300) | - |
$2,831 98,640 kWh |
$1,549 164 kW-months/year |
- - lb |
$(-1,200) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,285 Cost: $3,200 |
$1,804 | 62,880 | $1,481 | 157 | - | - | - | - | - | - |
$1,804 62,880 kWh |
$1,481 157 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT |
Savings: $1,102 Cost: $100 |
$1,870 | 62,259 | $1,232 | 131 | - | - | $(-2,000) | - | - | - |
$1,870 62,259 kWh |
$1,232 131 kW-months/year |
- - lb |
$(-2,000) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,454 Cost: $3,840 |
$1,587 | 55,296 | $867 | 92 | - | - | - | - | - | - |
$1,587 55,296 kWh |
$867 92 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $288 Cost: $500 |
- | - | - | - | $438 | 25,000 | - | - | $(-150) | - |
- - kWh |
- - kW-months/year |
$438 25,000 lb |
- - $ |
$(-150) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,009 Cost: $7,740 |
$8,092 | 279,075 | $5,129 | 544 | $438 | 25,000 | $(-3,200) | - | $(-450) | - | $8,092 279,075 kWh |
$5,129 544 kW-months/year |
$438 25,000 lb |
$(-3,200) - $ |
$(-450) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,165 Cost: $3,300 |
$4,635 | 161,520 | $3,030 | 321 | - | - | $(-1,200) | - | $(-300) | - | $4,635 161,520 kWh |
$3,030 321 kW-months/year |
- - lb |
$(-1,200) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |