IAC logo
IAC Assessment: NC0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Fiber reinforced rubber hose
NAICS 326220 - Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 150,000
Annual Production 9,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,156 4,659,100 kWh $0.04
Electricity Demand $91,821 12,347 kW-months/year $7.44
Electricity Fees $252 - $ -
Fuel Oil #2 $120,000 14,000 MMBtu $8.57
TOTAL ENERGY COSTS $383,229
RECOMMENDED SAVINGS* $49,979 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $669
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$36,051
Cost:
$3,500
$23,883 - $12,168 3,128 - - - - - - $23,883
-
kWh
$12,168
3,128
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,108
Cost:
$200
$1,515 - $6,593 1,008 - - $(-2,000) - - - $1,515
-
kWh
$6,593
1,008
kW-months/year
-
-
MMBtu
$(-2,000)
-
$
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,452
Cost:
$2,000
$1,427 44,742 $25 3 - - - - - - $1,427
44,742
kWh
$25
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,897
Cost:
$2,750
- - - - $2,897 338 - - - - -
-
kWh
-
-
kW-months/year
$2,897
338
MMBtu
-
-
$
-
-
$
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$2,802
Cost:
$1,000
- - - - $2,802 327 - - - - -
-
kWh
-
-
kW-months/year
$2,802
327
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$349
Cost:
$100
$524 16,440 $275 33 - - $(-300) - $(-150) - $524
16,440
kWh
$275
33
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-150)
-
$
07: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$320
Cost:
$58
$320 10,031 - - - - - - - - $320
10,031
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$49,979
Cost:
$9,608
$27,669 71,213 $19,061 4,172 $5,699 665 $(-2,300) - $(-150) - $27,669
71,213
kWh
$19,061
4,172
kW-months/year
$5,699
665
MMBtu
$(-2,300)
-
$
$(-150)
-
$
TOTAL IMPLEMENTED Savings:
$669
Cost:
$158
$844 26,471 $275 33 - - $(-300) - $(-150) - $844
26,471
kWh
$275
33
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-150)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost