IAC logo
IAC Assessment: NC0306
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0306
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Adhesive tapes
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 120,000
Annual Production 3,768,980 Thousand Feet
Production Hrs. Annual 8,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $623,860 30,233,088 kWh $0.02
Electricity Demand $462,430 56,052 kW-months/year $8.25
Natural Gas $714,644 120,022 MMBtu $5.95
TOTAL ENERGY COSTS $1,800,934
RECOMMENDED SAVINGS* $213,016 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,617
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$96,975
Cost:
$360,700
$76,222 1,905,540 $22,458 2,722 - - $(-1,705) (-5,015,827) $76,222
1,905,540
kWh
$22,458
2,722
kW-months/year
-
-
MMBtu
$(-1,705)
(-5,015,827)
Tgal
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$86,931
Cost:
$100,000
$(-18,480) (-462,000) $(-5,445) (-660) $110,856 18,631 - - $(-18,480)
(-462,000)
kWh
$(-5,445)
(-660)
kW-months/year
$110,856
18,631
MMBtu
-
-
Tgal
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$7,527
Cost:
$1,600
- - - - $7,527 1,265 - - -
-
kWh
-
-
kW-months/year
$7,527
1,265
MMBtu
-
-
Tgal
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$10,305
Cost:
$5,000
- - - - $10,305 1,732 - - -
-
kWh
-
-
kW-months/year
$10,305
1,732
MMBtu
-
-
Tgal
05: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$6,289
Cost:
$2,100
- - - - $6,289 1,057 - - -
-
kWh
-
-
kW-months/year
$6,289
1,057
MMBtu
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$204
Cost:
$79
$187 4,680 $17 2 - - - - $187
4,680
kWh
$17
2
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,785
Cost:
$100
$3,696 92,400 $1,089 132 - - - - $3,696
92,400
kWh
$1,089
132
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$213,016
Cost:
$469,579
$61,625 1,540,620 $18,119 2,196 $134,977 22,685 $(-1,705) (-5,015,827) $61,625
1,540,620
kWh
$18,119
2,196
kW-months/year
$134,977
22,685
MMBtu
$(-1,705)
(-5,015,827)
Tgal
TOTAL IMPLEMENTED Savings:
$22,617
Cost:
$6,700
$3,696 92,400 $1,089 132 $17,832 2,997 - - $3,696
92,400
kWh
$1,089
132
kW-months/year
$17,832
2,997
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal