IAC logo
IAC Assessment: NC0307
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0307
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Wooden laboratory cabinets
NAICS 337127 - Institutional Furniture Manufacturing
SIC 3821 - Laboratory Apparatus And Furniture
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 153,000
Annual Production 56,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,309 4,135,920 kWh $0.04
Electricity Demand $61,145 9,231 kW-months/year $6.62
Electricity Fees $6,872 - $ -
Natural Gas $80,206 9,976 MMBtu $8.04
TOTAL ENERGY COSTS $309,532
RECOMMENDED SAVINGS* $276,801 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,571
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$151,225
Cost:
$150,000
$1,225 31,400 - - - - $112,500 - $37,500 - $1,225
31,400
kWh
-
-
kW-months/year
-
-
MMBtu
$112,500
-
$
$37,500
-
$
02: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$72,400
Cost:
$49,500
- - - - - - $16,400 - $56,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$16,400
-
$
$56,000
-
$
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$32,361
Cost:
$24,000
- - - - $32,361 4,025 - - - - -
-
kWh
-
-
kW-months/year
$32,361
4,025
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,989
Cost:
$31,278
- - - - $16,989 2,113 - - - - -
-
kWh
-
-
kW-months/year
$16,989
2,113
MMBtu
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,342
Cost:
$1,456
$889 22,800 $453 68 - - - - - - $889
22,800
kWh
$453
68
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$313
Cost:
$381
$207 5,301 $106 16 - - - - - - $207
5,301
kWh
$106
16
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,171
Cost:
$100
$2,432 62,360 $1,239 187 - - $(-1,200) - $(-300) - $2,432
62,360
kWh
$1,239
187
kW-months/year
-
-
MMBtu
$(-1,200)
-
$
$(-300)
-
$
TOTAL RECOMMENDED Savings:
$276,801
Cost:
$256,715
$4,753 121,861 $1,798 271 $49,350 6,138 $127,700 - $93,200 - $4,753
121,861
kWh
$1,798
271
kW-months/year
$49,350
6,138
MMBtu
$127,700
-
$
$93,200
-
$
TOTAL IMPLEMENTED Savings:
$74,571
Cost:
$49,600
$2,432 62,360 $1,239 187 - - $15,200 - $55,700 - $2,432
62,360
kWh
$1,239
187
kW-months/year
-
-
MMBtu
$15,200
-
$
$55,700
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes