IAC Assessment: NC0310
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0310
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2005
Principal Product Metal cabinets and fume hoods
NAICS 337127 - Institutional Furniture Manufacturing
SIC 3821 - Laboratory Apparatus And Furniture
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 159,000
Annual Production 75,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,964 6,203,880 kWh $0.04
Electricity Demand $91,718 13,847 kW-months/year $6.62
Electricity Fees $10,150 - $ -
Natural Gas $320,822 39,903 MMBtu $8.04
TOTAL ENERGY COSTS $664,654
RECOMMENDED SAVINGS* $363,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $328,790
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$167,500
Cost:
$150,000
- - - - - - $112,500 - $55,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$112,500
-
$
$55,000
-
$
02: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$97,500
Cost:
$61,250
- - - - - - $22,500 - $75,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$22,500
-
$
$75,000
-
$
03: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$60,000
Cost:
$20,500
- - - - - - $60,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$60,000
-
$
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$34,863
Cost:
$30,000
- - - - $34,863 - - - - - -
-
kWh
-
-
kW-months/year
$34,863
-
MMBtu
-
-
$
-
-
$
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,451
Cost:
$3,000
$1,826 46,817 - - - - $(-375) - - - $1,826
46,817
kWh
-
-
kW-months/year
-
-
MMBtu
$(-375)
-
$
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,830
Cost:
$875
$1,830 46,925 - - - - - - - - $1,830
46,925
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$339
Cost:
$616
$169 4,322 $170 26 - - - - - - $169
4,322
kWh
$170
26
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$509
Cost:
$100
$995 25,521 $1,014 153 - - $(-900) - $(-600) - $995
25,521
kWh
$1,014
153
kW-months/year
-
-
MMBtu
$(-900)
-
$
$(-600)
-
$
TOTAL RECOMMENDED Savings:
$363,992
Cost:
$266,341
$4,820 123,585 $1,184 179 $34,863 - $193,725 - $129,400 - $4,820
123,585
kWh
$1,184
179
kW-months/year
$34,863
-
MMBtu
$193,725
-
$
$129,400
-
$
TOTAL IMPLEMENTED Savings:
$328,790
Cost:
$235,725
$4,651 119,263 $1,014 153 - - $193,725 - $129,400 - $4,651
119,263
kWh
$1,014
153
kW-months/year
-
-
MMBtu
$193,725
-
$
$129,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes