Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2005 |
Principal Product | Stretch wrap |
NAICS | 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081 - Unsupported Plastics Film & Sheet |
Sales | $10,000,000-$50,000,000 |
# of Employees | 260 |
Plant Area (Sq.Ft.) | 59,000 |
Annual Production | 2,689,600 Thousand Feet |
Production Hrs. Annual | 8,400 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $507,468 | 24,634,368 | kWh | $0.02 |
Electricity Demand | $376,795 | 45,672 | kW-months/year | $8.25 |
TOTAL ENERGY COSTS | $884,263 | |||
RECOMMENDED SAVINGS* | $29,659 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $327 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $18,271 Cost: $87,125 |
$24,360 | 609,000 | $7,128 | 864 | $(-13,217) | (-2,937,000) | - | - | - | - |
$24,360 609,000 kWh |
$7,128 864 kW-months/year |
$(-13,217) (-2,937,000) Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $10,570 Cost: $26,949 |
$10,570 | 264,260 | - | - | - | - | - | - | - | - |
$10,570 264,260 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $491 Cost: $321 |
$380 | 9,504 | $111 | 13 | - | - | - | - | - | - |
$380 9,504 kWh |
$111 13 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $327 Cost: $100 |
$793 | 19,824 | $234 | 28 | - | - | $(-400) | - | $(-300) | - |
$793 19,824 kWh |
$234 28 kW-months/year |
- - Tgal |
$(-400) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,659 Cost: $114,495 |
$36,103 | 902,588 | $7,473 | 905 | $(-13,217) | (-2,937,000) | $(-400) | - | $(-300) | - | $36,103 902,588 kWh |
$7,473 905 kW-months/year |
$(-13,217) (-2,937,000) Tgal |
$(-400) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $327 Cost: $100 |
$793 | 19,824 | $234 | 28 | - | - | $(-400) | - | $(-300) | - | $793 19,824 kWh |
$234 28 kW-months/year |
- - Tgal |
$(-400) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Administrative Changes |