IAC Assessment: NC0318
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0318
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2005
Principal Product Rough cut lumber
NAICS 423310 - Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers
SIC 2420 -
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 120,000
Annual Production 11,000 Thousand Feet
Production Hrs. Annual 2,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,042 1,525,200 kWh $0.02
Electricity Demand $99,521 12,063 kW-months/year $8.25
Electricity Fees $295 - $ -
TOTAL ENERGY COSTS $134,858
RECOMMENDED SAVINGS* $64,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,838
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$39,375
Cost:
$1,000
- - - - - - - - $39,375 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$39,375
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,668
Cost:
$20,000
- - $11,668 1,414 - - - - - - -
-
kWh
$11,668
1,414
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$10,275
Cost:
$18,500
$2,860 99,260 $7,415 596 - - - - - - $2,860
99,260
kWh
$7,415
596
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$443
Cost:
$585
$123 4,263 $320 26 - - - - - - $123
4,263
kWh
$320
26
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,927
Cost:
$5,332
$394 13,677 $1,533 123 - - - - - - $394
13,677
kWh
$1,533
123
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$244
Cost:
$100
$263 9,120 $681 55 $(-400) - $(-300) - - - $263
9,120
kWh
$681
55
kW-months/year
$(-400)
-
$
$(-300)
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$108
Cost:
$250
$30 1,042 $78 6 - - - - - - $30
1,042
kWh
$78
6
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$64,040
Cost:
$45,767
$3,670 127,362 $21,695 2,220 $(-400) - $(-300) - $39,375 - $3,670
127,362
kWh
$21,695
2,220
kW-months/year
$(-400)
-
$
$(-300)
-
$
$39,375
-
$
TOTAL IMPLEMENTED Savings:
$51,838
Cost:
$21,935
$416 14,425 $12,747 1,501 $(-400) - $(-300) - $39,375 - $416
14,425
kWh
$12,747
1,501
kW-months/year
$(-400)
-
$
$(-300)
-
$
$39,375
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes By-product Production