IAC Assessment: NC0324
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0324
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2005
Principal Product Upholstered furniture
NAICS 337121 - Upholstered Household Furniture Manufacturing
SIC 2512 - Upholstered Household Furniture
Sales $50,000,000-$100,000,000
# of Employees 410
Plant Area (Sq.Ft.) 365,000
Annual Production 120,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,210 2,147,749 kWh $0.04
Electricity Demand $73,471 10,032 kW-months/year $7.32
Electricity Fees $6,505 - $ -
Natural Gas $82,710 6,688 MMBtu $12.37
TOTAL ENERGY COSTS $250,896
RECOMMENDED SAVINGS* $9,933 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,060
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$4,040
Cost:
$500
- - - - - - $4,040 202,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,040
202,000
lb
02: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$524
Cost:
$500
- - - - - - $524 26,250 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$524
26,250
lb
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$413
Cost:
$2,000
$413 10,101 - - - - - - $413
10,101
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$1,571
Cost:
$5,425
$628 15,363 $943 307 - - - - $628
15,363
kWh
$943
307
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,365
Cost:
$3,749
$(-69) (-1,682) $(-28) 9 $2,462 199 - - $(-69)
(-1,682)
kWh
$(-28)
9
kW-months/year
$2,462
199
MMBtu
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,020
Cost:
$1,991
$750 18,350 $270 88 - - - - $750
18,350
kWh
$270
88
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$9,933
Cost:
$14,165
$1,722 42,132 $1,185 404 $2,462 199 $4,564 228,250 $1,722
42,132
kWh
$1,185
404
kW-months/year
$2,462
199
MMBtu
$4,564
228,250
lb
TOTAL IMPLEMENTED Savings:
$5,060
Cost:
$2,491
$750 18,350 $270 88 - - $4,040 202,000 $750
18,350
kWh
$270
88
kW-months/year
-
-
MMBtu
$4,040
202,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)