IAC logo
IAC Assessment: NC0335
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2006
Principal Product Mirrors
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 176,000
Annual Production 10,000 Thousand Feet
Production Hrs. Annual 1,600
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,258 1,518,000 kWh $0.03
Electricity Demand $95,607 9,992 kW-months/year $9.57
Electricity Fees $1,536 - $ -
Natural Gas $50,944 4,839 MMBtu $10.53
TOTAL ENERGY COSTS $207,242
RECOMMENDED SAVINGS* $44,053 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,861
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$20,000
Cost:
$4,500
- - - - - - - - $20,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$20,000
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$21,192
Cost:
$1,000
- - - - $21,192 2,013 - - - - -
-
kWh
-
-
kW-months/year
$21,192
2,013
MMBtu
-
-
$
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$244
Cost:
$248
$57 2,160 $187 19 - - - - - - $57
2,160
kWh
$187
19
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$752
Cost:
$500
$212 7,997 $540 56 - - - - - - $212
7,997
kWh
$540
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$398
Cost:
$100
$398 14,998 - - - - - - - - $398
14,998
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$67
Cost:
$147
- - - - $67 6 - - - - -
-
kWh
-
-
kW-months/year
$67
6
MMBtu
-
-
$
-
-
$
07: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$1,400
Cost:
$1,000
- - - - - - $200 - $1,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$200
-
$
$1,200
-
$
TOTAL RECOMMENDED Savings:
$44,053
Cost:
$7,495
$667 25,155 $727 75 $21,259 2,019 $200 - $21,200 - $667
25,155
kWh
$727
75
kW-months/year
$21,259
2,019
MMBtu
$200
-
$
$21,200
-
$
TOTAL IMPLEMENTED Savings:
$2,861
Cost:
$1,995
$667 25,155 $727 75 $67 6 $200 - $1,200 - $667
25,155
kWh
$727
75
kW-months/year
$67
6
MMBtu
$200
-
$
$1,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material