Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2006
Principal Product ATV
NAICS 336991 - Motorcycle, Bicycle, and Parts Manufacturing
SIC 3750 -
Sales >$500,000,000
# of Employees 1,800
Plant Area (Sq.Ft.) 400,000
Annual Production 275,000 Pieces
Production Hrs. Annual 4,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $906,190 27,502,794 kWh $0.03
Electricity Demand $548,808 53,731 kW-months/year $10.21
Electricity Fees $119,323 - $ -
Natural Gas $534,170 44,780 MMBtu $11.93
TOTAL ENERGY COSTS $2,108,491
RECOMMENDED SAVINGS* $150,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,564
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$63,286
Cost:
$175,000
$19,307 585,046 $23,646 2,316 - - $22,333 - $(-2,000) - $19,307
585,046
kWh
$23,646
2,316
kW-months/year
-
-
MMBtu
$22,333
-
$
$(-2,000)
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$54,759
Cost:
$18,800
- - - - $54,759 4,590 - - - - -
-
kWh
-
-
kW-months/year
$54,759
4,590
MMBtu
-
-
$
-
-
Tgal
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,391
Cost:
$2,500
$1,477 44,760 $914 90 - - - - - - $1,477
44,760
kWh
$914
90
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$20,374
Cost:
$75,000
$14,309 433,620 $6,065 594 - - - - - - $14,309
433,620
kWh
$6,065
594
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,416
Cost:
$16,843
$5,562 168,532 $2,854 280 - - - - - - $5,562
168,532
kWh
$2,854
280
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.2514 COVER OPEN TANKS Savings:
$1,097
Cost:
$1,600
$726 22,012 $371 36 - - - - - - $726
22,012
kWh
$371
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$150,323
Cost:
$289,743
$41,381 1,253,970 $33,850 3,316 $54,759 4,590 $22,333 - $(-2,000) - $41,381
1,253,970
kWh
$33,850
3,316
kW-months/year
$54,759
4,590
MMBtu
$22,333
-
$
$(-2,000)
-
Tgal
TOTAL IMPLEMENTED Savings:
$95,564
Cost:
$270,943
$41,381 1,253,970 $33,850 3,316 - - $22,333 - $(-2,000) - $41,381
1,253,970
kWh
$33,850
3,316
kW-months/year
-
-
MMBtu
$22,333
-
$
$(-2,000)
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption