IAC logo
IAC Assessment: NC0345
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0345
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2006
Principal Product Specialty plating chemicals
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 36,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,134 6,543,076 kWh $0.03
Electricity Demand $144,422 13,696 kW-months/year $10.54
Natural Gas $212,228 18,096 MMBtu $11.73
TOTAL ENERGY COSTS $576,784
RECOMMENDED SAVINGS* $22,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $291
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$8,498
Cost:
$4,000
$5,725 177,903 $2,773 284 - - $5,725
177,903
kWh
$2,773
284
kW-months/year
-
-
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,488
Cost:
$8,000
$2,488 77,308 - - - - $2,488
77,308
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,461
Cost:
$4,000
$2,147 66,735 - - $1,314 112 $2,147
66,735
kWh
-
-
kW-months/year
$1,314
112
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,300
Cost:
$50
$4,428 137,600 $1,872 192 - - $4,428
137,600
kWh
$1,872
192
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,538
Cost:
$2,465
$656 20,394 $882 90 - - $656
20,394
kWh
$882
90
kW-months/year
-
-
MMBtu
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$147
Cost:
$95
$54 1,664 $93 10 - - $54
1,664
kWh
$93
10
kW-months/year
-
-
MMBtu
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$291
Cost:
$95
$130 4,030 $161 17 - - $130
4,030
kWh
$161
17
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,723
Cost:
$18,705
$15,628 485,634 $5,781 593 $1,314 112 $15,628
485,634
kWh
$5,781
593
kW-months/year
$1,314
112
MMBtu
TOTAL IMPLEMENTED Savings:
$291
Cost:
$95
$130 4,030 $161 17 - - $130
4,030
kWh
$161
17
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas