IAC logo
IAC Assessment: NC0348
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0348
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2006
Principal Product Industrial chemicals
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 50,000
Annual Production 44,760,000 Pounds
Production Hrs. Annual 8,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $684,847 20,493,765 kWh $0.03
Electricity Demand $487,540 32,979 kW-months/year $14.78
Electricity Fees $6,000 - $ -
Fuel Oil #6 $289,410 44,506 MMBtu $6.50
TOTAL ENERGY COSTS $1,467,797
RECOMMENDED SAVINGS* $573,164 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes Increase in Production Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$98,735
Cost:
$59,350
- - - - $98,735 12,342 - - - - -
-
kWh
-
-
kW-months/year
$98,735
12,342
MMBtu
-
-
$
-
-
%
02: 2.2615 CLEAN CONDENSER TUBES Savings:
$123,800
Cost:
$5,000
$(-2,356) (-3,600) - - $(-2,327) (-291) $(-60,648) - $189,131 - $(-2,356)
(-3,600)
kWh
-
-
kW-months/year
$(-2,327)
(-291)
MMBtu
$(-60,648)
-
$
$189,131
-
%
03: 4.1130 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT Savings:
$315,779
Cost:
$167,000
- - $(-57,827) (-862,121) $(-4,656) (-582) - - $378,262 - -
-
kWh
$(-57,827)
(-862,121)
kW-months/year
$(-4,656)
(-582)
MMBtu
-
-
$
$378,262
-
%
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$23,395
Cost:
$10,000
- - - - $23,395 2,924 - - - - -
-
kWh
-
-
kW-months/year
$23,395
2,924
MMBtu
-
-
$
-
-
%
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,998
Cost:
$7,650
- - - - $8,998 1,125 - - - - -
-
kWh
-
-
kW-months/year
$8,998
1,125
MMBtu
-
-
$
-
-
%
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$2,457
Cost:
$2,420
- - - - $2,457 307 - - - - -
-
kWh
-
-
kW-months/year
$2,457
307
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$573,164
Cost:
$251,420
$(-2,356) (-3,600) $(-57,827) (-862,121) $126,602 15,825 $(-60,648) - $567,393 - $(-2,356)
(-3,600)
kWh
$(-57,827)
(-862,121)
kW-months/year
$126,602
15,825
MMBtu
$(-60,648)
-
$
$567,393
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes Increase in Production Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes Increase in Production