IAC Assessment: NC0353
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0353
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2007
Principal Product Knit products
NAICS 315190 - Other Apparel Knitting Mills
SIC 2259 - Knitting Mills, Nec
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 250,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $678,202 14,296,000 kWh $0.05
Electricity Demand $393,109 34,943 kW-months/year $11.25
Electricity Fees $38,319 - $ -
Natural Gas $1,339,770 129,110 MMBtu $10.38
TOTAL ENERGY COSTS $2,449,400
RECOMMENDED SAVINGS* $45,125 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,125
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$17,011
Cost:
$10,953
$11,539 243,225 $5,472 486 - - - - - - $11,539
243,225
kWh
$5,472
486
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$9,457
Cost:
$1,526
- - - - $9,457 756 - - - - -
-
kWh
-
-
kW-months/year
$9,457
756
MMBtu
-
-
$
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,562
Cost:
$3,000
- - - - $3,562 343 - - - - -
-
kWh
-
-
kW-months/year
$3,562
343
MMBtu
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,308
Cost:
$2,000
$1,174 24,737 $1,134 101 - - - - - - $1,174
24,737
kWh
$1,134
101
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$654
Cost:
$100
$1,664 35,078 $790 70 - - $(-900) - $(-900) - $1,664
35,078
kWh
$790
70
kW-months/year
-
-
MMBtu
$(-900)
-
$
$(-900)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,078
Cost:
$20,770
$6,838 144,149 $3,240 288 - - - - - - $6,838
144,149
kWh
$3,240
288
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,055
Cost:
$712
$1,393 29,370 $662 59 - - - - - - $1,393
29,370
kWh
$662
59
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,125
Cost:
$39,061
$22,608 476,559 $11,298 1,004 $13,019 1,099 $(-900) - $(-900) - $22,608
476,559
kWh
$11,298
1,004
kW-months/year
$13,019
1,099
MMBtu
$(-900)
-
$
$(-900)
-
$
TOTAL IMPLEMENTED Savings:
$45,125
Cost:
$39,061
$22,608 476,559 $11,298 1,004 $13,019 1,099 $(-900) - $(-900) - $22,608
476,559
kWh
$11,298
1,004
kW-months/year
$13,019
1,099
MMBtu
$(-900)
-
$
$(-900)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost