IAC logo
IAC Assessment: NC0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2007
Principal Product Processed chicken
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 425
Plant Area (Sq.Ft.) 90,000
Annual Production 175,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $665,912 22,049,280 kWh $0.03
Electricity Demand $418,651 46,829 kW-months/year $8.94
Electricity Fees $32,815 - $ -
Natural Gas $1,021,827 104,338 MMBtu $9.79
TOTAL ENERGY COSTS $2,139,205
RECOMMENDED SAVINGS* $780,911 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Electricity Usage Electricity Demand Natural Gas Other Energy
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$43,646
Cost:
$70,525
- - - - $43,646 4,458 - - -
-
kWh
-
-
kW-months/year
$43,646
4,458
MMBtu
-
-
MMBtu
02: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$75,775
Cost:
$79,525
- - - - $75,775 7,740 - - -
-
kWh
-
-
kW-months/year
$75,775
7,740
MMBtu
-
-
MMBtu
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,512
Cost:
$3,546
$2,164 71,640 $1,348 143 - - - - $2,164
71,640
kWh
$1,348
143
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,160
Cost:
$50
$1,522 50,400 $638 68 - - - - $1,522
50,400
kWh
$638
68
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$295
Cost:
$537
$203 6,732 $92 10 - - - - $203
6,732
kWh
$92
10
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$655,523
Cost:
$2,000,000
- - - - $25,523 2,670 $630,000 35,280 -
-
kWh
-
-
kW-months/year
$25,523
2,670
MMBtu
$630,000
35,280
MMBtu
TOTAL RECOMMENDED Savings:
$780,911
Cost:
$2,154,183
$3,889 128,772 $2,078 221 $144,944 14,868 $630,000 35,280 $3,889
128,772
kWh
$2,078
221
kW-months/year
$144,944
14,868
MMBtu
$630,000
35,280
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Other Energy Electricity Usage Electricity Demand Natural Gas Other Energy