IAC Assessment: NC0368
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0368
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2007
Principal Product Furniture
NAICS 337122 - Nonupholstered Wood Household Furniture Manufacturing
SIC 2511 - Wood Household Furniture
Sales $100,000,000-$500,000,000
# of Employees 1,000
Plant Area (Sq.Ft.) 300,000
Annual Production 350,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $843,283 18,703,101 kWh $0.05
Electricity Demand $167,366 48,512 kW-months/year $3.45
Coal $57,622 13,230 MMBtu $4.36
TOTAL ENERGY COSTS $1,068,271
RECOMMENDED SAVINGS* $62,769 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,812
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$42,586
Cost:
$100,000
$46,150 923,735 $8,169 2,368 - - $(-8,733) (-6,666,100) - - $(-3,000) - $46,150
923,735
kWh
$8,169
2,368
kW-months/year
-
-
MMBtu
$(-8,733)
(-6,666,100)
Tgal
-
-
$
$(-3,000)
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$640
Cost:
$1,297
$530 10,605 $110 32 - - - - - - - - $530
10,605
kWh
$110
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,202
Cost:
$7,000
- - - - $4,202 966 - - - - - - -
-
kWh
-
-
kW-months/year
$4,202
966
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,775
Cost:
$5,800
$2,360 47,240 $415 120 - - - - - - - - $2,360
47,240
kWh
$415
120
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,986
Cost:
$100
$9,395 188,055 $1,191 345 - - - - $(-1,200) - $(-400) - $9,395
188,055
kWh
$1,191
345
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,200)
-
$
$(-400)
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$267
Cost:
$960
$224 4,477 $43 12 - - - - - - - - $224
4,477
kWh
$43
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,394
Cost:
$3,917
$1,087 21,751 $307 89 - - - - - - - - $1,087
21,751
kWh
$307
89
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,919
Cost:
$50
$1,535 30,720 $384 112 - - - - - - - - $1,535
30,720
kWh
$384
112
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$62,769
Cost:
$119,124
$61,281 1,226,583 $10,619 3,078 $4,202 966 $(-8,733) (-6,666,100) $(-1,200) - $(-3,400) - $61,281
1,226,583
kWh
$10,619
3,078
kW-months/year
$4,202
966
MMBtu
$(-8,733)
(-6,666,100)
Tgal
$(-1,200)
-
$
$(-3,400)
-
$
TOTAL IMPLEMENTED Savings:
$11,812
Cost:
$2,407
$11,684 233,857 $1,728 501 - - - - $(-1,200) - $(-400) - $11,684
233,857
kWh
$1,728
501
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,200)
-
$
$(-400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost