Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2008 |
Principal Product | Fiber optic cable |
NAICS | 335921 - Fiber Optic Cable Manufacturing |
SIC | 3357 - Nonferrous Wiredrawing & Insulating |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 315,028 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $656,729 | 22,654,800 | kWh | $0.03 |
Electricity Demand | $377,326 | 40,451 | kW-months/year | $9.33 |
Electricity Fees | $77,120 | - | $ | - |
TOTAL ENERGY COSTS | $1,111,175 | |||
RECOMMENDED SAVINGS* | $276,853 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,009 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Ancillary Material Cost | Electricity Usage | Electricity Demand | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7271 REPLACE ELECTRIC REHEAT WITH HEAT PIPES |
Savings: $215,106 Cost: $219,000 |
$154,403 | 5,326,080 | $60,703 | 7,296 | - | - |
$154,403 5,326,080 kWh |
$60,703 7,296 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $444 Cost: $100 |
$319 | 11,003 | $125 | 15 | - | - |
$319 11,003 kWh |
$125 15 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $15,277 Cost: $17,280 |
$9,706 | 334,800 | $5,571 | 670 | - | - |
$9,706 334,800 kWh |
$5,571 670 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,923 Cost: $4,350 |
$1,855 | 63,976 | $1,068 | 128 | - | - |
$1,855 63,976 kWh |
$1,068 128 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $2,415 Cost: $2,000 |
$2,415 | 83,300 | - | - | - | - |
$2,415 83,300 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,037 Cost: $2,000 |
$1,847 | 63,708 | $1,190 | 182 | - | - |
$1,847 63,708 kWh |
$1,190 182 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $2,143 Cost: $10,000 |
$1,477 | 50,938 | $666 | 102 | - | - |
$1,477 50,938 kWh |
$666 102 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $998 Cost: - |
- | - | $998 | 120 | - | - |
- - kWh |
$998 120 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $288 Cost: $485 |
$203 | 7,000 | $85 | 10 | - | - |
$203 7,000 kWh |
$85 10 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $28,534 Cost: $85,000 |
$(-4,870) | (-168,000) | $(-2,796) | (-336) | $36,200 | - |
$(-4,870) (-168,000) kWh |
$(-2,796) (-336) kW-months/year |
$36,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $5,688 Cost: $13,149 |
$3,614 | 124,653 | $2,074 | 249 | - | - |
$3,614 124,653 kWh |
$2,074 249 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $276,853 Cost: $353,364 |
$170,969 | 5,897,458 | $69,684 | 8,436 | $36,200 | - | $170,969 5,897,458 kWh |
$69,684 8,436 kW-months/year |
$36,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,009 Cost: $17,865 |
$10,228 | 352,803 | $5,781 | 695 | - | - | $10,228 352,803 kWh |
$5,781 695 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Ancillary Material Cost | Electricity Usage | Electricity Demand | Ancillary Material Cost |