IAC logo
IAC Assessment: NC0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2008
Principal Product Cutting tools
NAICS 333515 - Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545 - Machine Tool Accessories
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 109,000
Annual Production 2,600,000 Pieces
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $400,563 8,958,750 kWh $0.04
Electricity Demand $154,483 18,422 kW-months/year $8.39
Electricity Fees $17,666 - $ -
Natural Gas $11,684 918 MMBtu $12.73
TOTAL ENERGY COSTS $584,396
RECOMMENDED SAVINGS* $28,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,061
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,790
Cost:
$7,000
$3,790 94,848 - - - - - - $3,790
94,848
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$15,885
Cost:
$41,750
$5,638 125,559 $1,747 209 $(-5,000) - $13,500 - $5,638
125,559
kWh
$1,747
209
kW-months/year
$(-5,000)
-
$
$13,500
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$3,903
Cost:
$7,500
$3,903 86,916 - - - - - - $3,903
86,916
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,473
Cost:
$1,680
$1,125 25,056 $348 42 - - - - $1,125
25,056
kWh
$348
42
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,999
Cost:
$4,820
$1,526 33,984 $473 57 - - - - $1,526
33,984
kWh
$473
57
kW-months/year
-
-
$
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,686
Cost:
$2,173
$1,288 28,679 $398 48 - - - - $1,288
28,679
kWh
$398
48
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$28,736
Cost:
$64,923
$17,270 395,042 $2,966 356 $(-5,000) - $13,500 - $17,270
395,042
kWh
$2,966
356
kW-months/year
$(-5,000)
-
$
$13,500
-
$
TOTAL IMPLEMENTED Savings:
$9,061
Cost:
$16,173
$7,842 174,635 $1,219 147 - - - - $7,842
174,635
kWh
$1,219
147
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost