IAC Assessment: NC0384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2008
Principal Product Corrugated packaging materials
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 147,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,187 2,344,708 kWh $0.05
Electricity Demand $21,125 6,881 kW-months/year $3.07
Electricity Fees $7,575 - $ -
Natural Gas $156,556 13,894 MMBtu $11.27
TOTAL ENERGY COSTS $299,443
RECOMMENDED SAVINGS* $25,642 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,285
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,481
Cost:
$5,000
- - - - $10,481 776 - - - - -
-
kWh
-
-
kW-months/year
$10,481
776
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,352
Cost:
$100
$4,156 85,342 $756 246 - - $(-1,200) - $(-360) - $4,156
85,342
kWh
$756
246
kW-months/year
-
-
MMBtu
$(-1,200)
-
$
$(-360)
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,929
Cost:
$7,700
$3,325 68,274 $604 197 - - - - - - $3,325
68,274
kWh
$604
197
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,428
Cost:
$3,142
$1,208 24,815 $220 72 - - - - - - $1,208
24,815
kWh
$220
72
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,068
Cost:
$271
- - - - $1,068 81 - - - - -
-
kWh
-
-
kW-months/year
$1,068
81
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,272
Cost:
$5,000
$4,207 86,395 $766 249 - - $(-1,068) - $367 - $4,207
86,395
kWh
$766
249
kW-months/year
-
-
MMBtu
$(-1,068)
-
$
$367
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,112
Cost:
$500
$941 19,323 $171 56 - - - - - - $941
19,323
kWh
$171
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,642
Cost:
$21,713
$13,837 284,149 $2,517 820 $11,549 857 $(-2,268) - $7 - $13,837
284,149
kWh
$2,517
820
kW-months/year
$11,549
857
MMBtu
$(-2,268)
-
$
$7
-
$
TOTAL IMPLEMENTED Savings:
$20,285
Cost:
$10,871
$9,304 191,060 $1,693 551 $11,549 857 $(-2,268) - $7 - $9,304
191,060
kWh
$1,693
551
kW-months/year
$11,549
857
MMBtu
$(-2,268)
-
$
$7
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost