Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2009 |
Principal Product | Blow molded plastic parts |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 8,600 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $284,932 | 9,139,780 | kWh | $0.03 |
Electricity Demand | $142,834 | 17,763 | kW-months/year | $8.04 |
Electricity Fees | $6,915 | - | $ | - |
Natural Gas | $31,252 | 2,274 | MMBtu | $13.74 |
TOTAL ENERGY COSTS | $465,933 | |||
RECOMMENDED SAVINGS* | $16,917 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,048 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $4,869 Cost: $25,000 |
$3,640 | 110,990 | $1,229 | 155 | - | - | - | - | - | - |
$3,640 110,990 kWh |
$1,229 155 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $400 Cost: $10,000 |
- | - | - | - | $400 | 29 | - | - | - | - |
- - kWh |
- - kW-months/year |
$400 29 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,091 Cost: $100 |
$1,264 | 38,528 | $427 | 54 | - | - | $(-300) | - | $(-300) | - |
$1,264 38,528 kWh |
$427 54 kW-months/year |
- - MMBtu |
$(-300) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,810 Cost: - |
$3,161 | 96,382 | $1,327 | 167 | - | - | $(-1,032) | - | $354 | - |
$3,161 96,382 kWh |
$1,327 167 kW-months/year |
- - MMBtu |
$(-1,032) - $ |
$354 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $99 Cost: $150 |
$74 | 2,248 | $25 | 3 | - | - | - | - | - | - |
$74 2,248 kWh |
$25 3 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $995 Cost: $160 |
$99 | 3,008 | $72 | 9 | - | - | $619 | - | $205 | - |
$99 3,008 kWh |
$72 9 kW-months/year |
- - MMBtu |
$619 - $ |
$205 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $5,653 Cost: $8,935 |
$4,226 | 128,834 | $1,427 | 180 | - | - | - | - | - | - |
$4,226 128,834 kWh |
$1,427 180 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $16,917 Cost: $44,345 |
$12,464 | 379,990 | $4,507 | 568 | $400 | 29 | $(-713) | - | $259 | - | $12,464 379,990 kWh |
$4,507 568 kW-months/year |
$400 29 MMBtu |
$(-713) - $ |
$259 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,048 Cost: $19,345 |
$8,824 | 269,000 | $3,278 | 413 | $400 | 29 | $(-713) | - | $259 | - | $8,824 269,000 kWh |
$3,278 413 kW-months/year |
$400 29 MMBtu |
$(-713) - $ |
$259 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |