IAC Assessment: NC0388
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0388
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2009
Principal Product Blow molded plastic parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 80,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 8,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $284,932 9,139,780 kWh $0.03
Electricity Demand $142,834 17,763 kW-months/year $8.04
Electricity Fees $6,915 - $ -
Natural Gas $31,252 2,274 MMBtu $13.74
TOTAL ENERGY COSTS $465,933
RECOMMENDED SAVINGS* $16,917 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,048
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,869
Cost:
$25,000
$3,640 110,990 $1,229 155 - - - - - - $3,640
110,990
kWh
$1,229
155
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$400
Cost:
$10,000
- - - - $400 29 - - - - -
-
kWh
-
-
kW-months/year
$400
29
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,091
Cost:
$100
$1,264 38,528 $427 54 - - $(-300) - $(-300) - $1,264
38,528
kWh
$427
54
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-300)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,810
Cost:
-
$3,161 96,382 $1,327 167 - - $(-1,032) - $354 - $3,161
96,382
kWh
$1,327
167
kW-months/year
-
-
MMBtu
$(-1,032)
-
$
$354
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$99
Cost:
$150
$74 2,248 $25 3 - - - - - - $74
2,248
kWh
$25
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$995
Cost:
$160
$99 3,008 $72 9 - - $619 - $205 - $99
3,008
kWh
$72
9
kW-months/year
-
-
MMBtu
$619
-
$
$205
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,653
Cost:
$8,935
$4,226 128,834 $1,427 180 - - - - - - $4,226
128,834
kWh
$1,427
180
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,917
Cost:
$44,345
$12,464 379,990 $4,507 568 $400 29 $(-713) - $259 - $12,464
379,990
kWh
$4,507
568
kW-months/year
$400
29
MMBtu
$(-713)
-
$
$259
-
$
TOTAL IMPLEMENTED Savings:
$12,048
Cost:
$19,345
$8,824 269,000 $3,278 413 $400 29 $(-713) - $259 - $8,824
269,000
kWh
$3,278
413
kW-months/year
$400
29
MMBtu
$(-713)
-
$
$259
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost