IAC Assessment: NC0389
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0389
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2009
Principal Product Printing sleeves
NAICS 333244 - Printing Machinery and Equipment Manufacturing
SIC 3555 - Printing Trades Machinery
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 88,000
Annual Production 100,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,281 6,846,331 kWh $0.03
Electricity Demand $131,821 15,067 kW-months/year $8.75
Electricity Fees $7,851 - $ -
Natural Gas $60,725 4,490 MMBtu $13.52
TOTAL ENERGY COSTS $426,678
RECOMMENDED SAVINGS* $21,509 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $958
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,752
Cost:
$54,282
$17,343 379,320 $2,178 758 - - $(-3,379) - $610 - $17,343
379,320
kWh
$2,178
758
kW-months/year
-
-
MMBtu
$(-3,379)
-
$
$610
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,172
Cost:
$4,300
- - - - $3,172 250 - - - - -
-
kWh
-
-
kW-months/year
$3,172
250
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$627
Cost:
-
$557 12,180 $70 24 - - - - - - $557
12,180
kWh
$70
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$387
Cost:
$100
$859 18,787 $108 28 - - $(-400) - $(-180) - $859
18,787
kWh
$108
28
kW-months/year
-
-
MMBtu
$(-400)
-
$
$(-180)
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$571
Cost:
$892
$507 11,079 $64 22 - - - - - - $507
11,079
kWh
$64
22
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,509
Cost:
$59,574
$19,266 421,366 $2,420 832 $3,172 250 $(-3,779) - $430 - $19,266
421,366
kWh
$2,420
832
kW-months/year
$3,172
250
MMBtu
$(-3,779)
-
$
$430
-
$
TOTAL IMPLEMENTED Savings:
$958
Cost:
$992
$1,366 29,866 $172 50 - - $(-400) - $(-180) - $1,366
29,866
kWh
$172
50
kW-months/year
-
-
MMBtu
$(-400)
-
$
$(-180)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost